BPCS/LX Tip of the Week: Indirect Time

Anthony Etzel 0 1002 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.
 

  1. If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  2. If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

 

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

 

10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 37681 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 72268 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 79013 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 31337 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 67165 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 100667 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

First116117118119121123124125Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Crossroads RMC

Revamp Your Productivity: Discover Crossroads RMC's Ultimate Solution

In the dynamic landscape of life hacks and evolving routines, finding new ways to enhance productivity is always on our agenda.

Enter Crossroads RMC – your secret weapon for multiplying productivity effortlessly! Imagine elevating your team's output by integrating just ONE additional member, available on-demand. What sets this apart is the convenience of access—our specialists are ready to assist you 24/7, even during weekends and holidays.

Introducing Tailored Staff Augmentation Services by Crossroads RMC:

  • Access to functional and technical support around the clock.
  • In-depth expertise as an Infor Partner across all Infor LN / Baan and Infor LX / BPCS versions.
  • Centralized, dedicated support ensuring quick response times and thorough follow-up.
  • Varied communication channels including phone, text, email, online portals, Microsoft Teams, web meetings, and in-person visits.
  • Transparent monthly reports to monitor service utilization.
  • Comprehensive ERP disaster recovery solutions.
  • Specialized ION support.


Kickstart with a complimentary 1-hour consultation to explore our customizable staff augmentation plans. These plans are crafted to simplify case logging, usage tracking, meeting scheduling, live chatting, Infor resource reviews, and much more.

Ready for a transformative consultation? Secure your free 1-hour session:

Leverage decades of manufacturing ERP and IT expertise for your enterprise. Crossroads RMC designs Staff Augmentation Services with your needs in mind.  Get in touch: 800.762.2077

Explore Our Services:


Client Accolades:

"The support from Crossroads RMC was a highlight in my 20 years in the field; having been a consultant myself, I found Hugh Carty and Luis Diaz not only technically adept but also exceptionally respectful and polite to our team. They embody the ideal consultant profile. We'd eagerly engage them again for future needs." - IT Director

"Our project's success speaks volumes, and Crossroads RMC's contribution was pivotal. Their team brought unparalleled expertise and project management to the table, making them an indispensable part of our journey. Collaborating with Crossroads RMC has been an absolute delight." - IS Manager

Print
12654 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

x

Categories