BPCS/LX Tip of the Week: Indirect Time

Anthony Etzel 0 1002 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.
 

  1. If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  2. If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

 

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

 

10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Rich Grilli 0 37316 Article rating: 5.0


Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness  metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that this is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

BPCS/LX Tip of the Week: Is Lot Control Necessary?

Anthony Etzel 0 71857 Article rating: No rating

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

Baan/LN Tip of the Week: Default Order Frequency

Kathy Barthelt 0 78757 Article rating: No rating

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In ERP LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period. For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Crossroads RMC to Exhibit at COMMON Conference, April 26-29

Crossroads RMC 0 31160 Article rating: No rating

The Annual Meeting is COMMON’s largest educational event of the year, with four full days of in-depth IBM i, AIX, and Linux-related education that includes all-day pre-conference workshops, open labs and a wide variety of regular-length sessions. It is the annual meeting of the COMMON membership and the largest gathering of the Power Systems user community. Come see us in Booth 316.

BPCS/LX Tip of the Week: Batch Allocation

Anthony Etzel 0 66751 Article rating: 5.0

Thinking of moving from your old BPCS Version to LX?

There are numerous reasons to consider moving to Infor LX. It is a proven migration and it is easy to get there.

An area of interest may be allocations. Allocations can be difficult to manage, but with Infor LX, there is a new selection of ranges for Batch Allocations:

    • Sold To Customer
    • Ship To Number
    • Order Class
    • Order Number
    • Item Number
    • Request Date
    • Schedule Date

Baan/LN Tip of the Week: Safety Time

Kathy Barthelt 0 99801 Article rating: No rating

You can add safety time in the item master for the item. This will add the number of days safety time to the order lead time thus bringing the order in x number of days early. (x is the safety time).

The safety time is on form 4 of the item master in Baan IV and in Item Ordering Data – Generation I tab in Baan V and LN.

First114115116117119121122123Last

Tips:  LX | BPCS | M3

Improves control over PO costing changes during invoice entry by replacing passive warnings with an intentional override action.

  • In ACP500D3 (Invoice Entry PO Costing), users previously could unintentionally accept changes by pressing ENTER, even when quantity to cost or amount to cost values had changed.

  • A new “F14 to Override” warning message replaces the old message:
    “Details have changed. Press enter again to accept data.”
    This ensures users acknowledge and confirm significant changes explicitly.

New System Parameter:

  • “Apply GRN Costing Tolerance for PO Costing” (optional):

    • Within tolerance: Displays the original message —
      “Details have changed. Press enter again to accept data.”

    • Outside tolerance: Triggers the new override requirement —
      “F14 to Override”

Benefits:

  • Enhances oversight and reduces unintentional cost acceptance.

  • Enables better control of PO costs when invoice details differ from expectations.

Last

Tips: LN | Baan

You can benefit from a business process review only if...

You can benefit from a business process review only if...

Infor LX | BPCS | Infor LN | Baan

Did you implement your ERP system 5 years ago… or maybe 20 years ago? At the time, it was like a brand new car… sleek, fast, top-of-the-line, and fuel-efficient. And although it may have needed a few minor “adjustments”, overall you were very pleased. Fast forward to today. Does it still have that new car smell? Does it run as efficiently as it used to? Do you know how to fix a problem when it occurs?

While ERP systems are certainly designed to last, over time, your business changes, your customers’ needs change, employees change and you are left with a system that may run “fine”, but you certainly don’t feel the same way about it as you did when it was brand new.

So the good news is that you CAN restore that “new car smell” with a utilization review, or business process review.

What is a Utilization or Business Process Review and Why Do I Need One?
Simply put, a business process review is an exercise designed to help businesses identify areas of improvement to become more agile, efficient, and streamlined.

Does my organization need a Business Process Review? 

While every company could benefit from conducting a business process review, it's only worth the time and effort if you have a specific problem you're trying to solve or a goal you are trying to achieve. Furthermore, and perhaps most importantly, organizations must be ready and willing to make changes. 

That's why a business process review is critical; it helps align processes, define goals, and thoughtfully plan and build solutions that help businesses achieve actual growth.

Our consultant reviews the current usage and related business processes of your entire Infor ERP system, or a particular area like Finance, Manufacturing, Materials Management, or Technology to make recommendations that will reinvigorate your Infor ERP system and those that use it.

Other benefits include:

  • Creating a consistent way of working across the business
  • Automating processes to reduce effort and increase productivity
  • Improving decision-making capability by providing access to real-time, reliable, and accurate information
  • Creating opportunities to improve your customer service levels and response times
  • Increasing your ability to attract and retain quality staff

Your ERP system may require some engine work, or it may just require an oil change and an expert to look everything over to make sure things are running smoothly. Either way – whether this is a project you take on internally or decide that you need some expert guidance from a company like Crossroads RMC, it is worth the time and investment to ensure peak performance.

Business process reviews can be performed 100% remotely via phone or web meeting, or in person – you choose what works best for your team.

Contact Us: 800.762.2077 | solutions@crossroadsrmc.com


 

Print
20515 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

x

Categories