Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Filtec Selects Crossroads RMC for Baan Data Collection

Kathy Barthelt 0 28896 Article rating: No rating

Filtec, a leading provider of in-line inspection solutions for the food, beverage, and pharmaceutical industries, has selected the Web Collect, formerly RMC3 data collection solution from Crossroads RMC for their Baan IV system. Filtec plans to implement Labor Reporting and Report Operations Complete as part of this project with the goal of eliminating manual data entry and gaining better visibility to gap time. The project is scheduled to go live in early November 2015.

BPCS/LX TIP OF THE DAY: MATERIAL REQUIREMENT DATES AND LEAD TIME OFFSETS IN MRP

Anthony Etzel 0 63601 Article rating: No rating

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

Baan/LN Tip of the Week: Data Sizing Moving to LN

Kathy Barthelt 0 57625 Article rating: No rating

The Infor LN database must be created with the appropriate size. For example, if at least 150 GB is required for a year, create the database with the required size from the beginning. Do not let the size increase to the required size and cause additional fragmentation in the database and the NTFS volume.  Set the autogrowth to a minimum of 10 percent or 1 GB (for each extent) to avoid fragmentation on file system level. Never use the default extent size of 1 MB.

BPCS/LX Tip of the Week: Work Center & Machine Locations

Anthony Etzel 0 61194 Article rating: 3.0

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

Baan/LN Tip of the Week: SIC Planning for MRP/MPS Planned Items

Kathy Barthelt 0 67425 Article rating: 3.0

If you have a parts warehouse and prefer to use SIC for planning (re-order point) but need to use MRP/MPS planning for production, create a non-nettable warehouse for the parts warehouse and run the SIC plan against that warehouse.

When running the SIC plan, be sure to set the Order System to “MPS to MRP” for Baan IV and to “Planned to Planned” for Baan V and LN.

Using this method you keep the parts inventory out of the production planning and in the hands of the parts warehouse planner.

BPCS/LX Tip of the Week: Indirect Time Reporting

Anthony Etzel 0 59724 Article rating: No rating

In Infor LX, there are two ways to enter indirect labor. You can use either SFC600 or SFC650.

  • If you use SFC600 and enter a reason code for the indirect labor, the reason you entered is written to the Labor Ticket file.
  • If you use SFC650 and enter a reason code for the indirect, the reason code is not written to the labor Ticket file.

In either case, the reason code is not validated from the transaction file because there is no indirect transaction code. The indirect code that can be setup is machine downtime. If you need to validate and track indirect by reason and validate the reason code, then you may want to explore an MES solution that works with Infor LX.

Baan/LN Tip of the Week: Differences Between Constraint Planning in Baan IV and Enterprise Planning in LN

Kathy Barthelt 0 56340 Article rating: No rating

In Baan IV, a distinction is made between the actual ERP system and a separate planning tool which contains the Constraint Planning package. This tool was intended to work with any ERP system, not just with Baan IV. The Enterprise Planning package is now considered to be a package like any other package in Infor LN.

Users of Baan IV could choose whether they wanted to plan their supply in one of the following ways:

  • By using the MPS and MRP modules in the Manufacturing package.
  • By using the RPD and RMP modules in the Constraint Planning package.

Users of Infor LN can only use the Enterprise Planning package. The distinction between the MPS items and MRP items has been abandoned. In Infor LN, all items can be planned by using a combination of master-based planning methods and order-based planning methods.

Baan/LN Tip of the Week: Setting Up New Employees in LN

Kathy Barthelt 0 55986 Article rating: No rating

In LN, the People package is used to register the employee’s hours and expenses. To support the People package, the Employees - General (tccom0101m000) session only contains the general employee data.

The title of the Employees - General (tccom0101m000) session was changed to Employees – General (tccom0101m000).

From the Employees - General (tccom0101m000) session, users can start the following sessions to define the more specific employee data:

  • Employees - People (bpmdm0101m000).
  • Employees - Project (tppdm8101m000).
  • Employees - Service (tsmdm1140m000).
  • Skills by Employee (tcppl0120m000).
  • Employees by Team (tcppl0150m000).
  • Roles by Employee (tcppl0170m000).

After users define the employees, users can also start the listed sessions from the Employees Dashboard (bpmdm0101m100) session in People.

First110111112113115117118119Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Avoid Being a Quitter: How Crossroads RMC Can Help You Achieve Your Goals

Unlocking Success Infor LX/BPCS & Infor LN and Baan

Avoid Being a Quitter

As the calendar flips to January 1st, it marks the beginning of a new year filled with fresh opportunities and resolutions. It's that time when many of us set ambitious goals for ourselves, both personally and professionally. But, how often do these aspirations fizzle out before we even hit the second Friday of the year? It's so common that they even call it "Quitter's Day." However, it's not too late to stay on track and realize your ambitions. In this article, we'll focus on the professional side of goal-setting and how Crossroads RMC can be your ally in achieving manufacturing excellence.

Step 1: Make Your Goals Bite-Sized

While you might have grand ambitions, like upgrading your ERP system, increasing customer satisfaction, or optimizing your supply chain, achieving these goals often involves breaking them down into smaller, manageable projects. Here's how you can start:

  • Why: Understand why you want to make these changes. Is it to retain your top customers, leverage new ERP features, or streamline your supply chain?
  • What: Clearly define the desired outcomes – be it increased sales, enhanced efficiency, or cost reduction.
  • Who: Identify the key players who can help you achieve these goals. Do you have the necessary resources in-house, or should you consider external expertise?
  • When: Establish a timeline, considering your overall company initiatives, project priorities, and deadlines. Make your goals specific, measurable, attainable, and time-based (SMART).

For example:

  • Increase customer satisfaction for our top 5 customers by 10% in the next 6 months.
  • Reduce production mistakes in our welding department by 50% within a year.


Step 2: Identify Roadblocks

What's preventing you from reaching your goals? Is it a lack of resources, support, or the right tools? Consider these factors:

  • Lack of bandwidth: Assess your team's capacity. Can you involve colleagues from other departments or partners?
  • Support: Get buy-in from business leaders by demonstrating the ROI and benefits of your project. Educate your coworkers on its importance.
  • Tools: Explore features in your ERP system that you might not be utilizing fully. Is an upgrade or additional software add-ons needed?

 
Step 3: Take Action and Persist

Creating a plan is vital, but remember, the path to success isn't always smooth. Prepare for challenges and adapt as needed:

  • Develop a comprehensive plan to execute your goals.
  • Communication is key. Keep your team informed about progress and challenges.
  • Adjust your plan when necessary. Mistakes are part of the journey and can lead to future success.


How Crossroads RMC Can Help You in 2024

At Crossroads RMC, we understand the challenges manufacturers face, and we're here to support your journey to success. Here's how we can assist:

  • Implement new functionality in your existing ERP system.
  • Lead the way in upgrading your ERP to the latest version.
  • Provide training based on best practices for your employees.
  • Automate time-consuming, manual processes.
  • Integrate your systems, creating a seamless, cohesive environment.
  • Deliver ERP add-on solutions that save you time and money.

We offer a comprehensive range of consulting services and software designed to optimize manufacturing by reducing costs, improving quality, and enhancing efficiency.

Learn More:

Infor LX & BPCS Services> Infor LX & BPCS Software>

Infor LN & Baan Services> Infor LN & Baan Software>
 

It's Time for Action!

Contact us today at solutions@crossroadsrmc.com or call us at 800.762.2077 to discuss your ERP goals. Let Crossroads RMC be your partner in making 2024 a resounding success for your manufacturing business!

Print
14617 Rate this article:
.2
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

x

Categories