BPCS/LX Tip of the Week: 6 powerful steps to win with automation

Anthony Etzel 0 57481 Article rating: No rating

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Baan/LN Tip of the Week: 6 Powerful Steps to Win With Automation

Kathy Barthelt 0 85250 Article rating: No rating

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

BPCS/LX Tip of the Week: Receiving to Inspection

Anthony Etzel 0 63540 Article rating: No rating

If the item being received needs to be inspected prior to being available for use, there are two schools of thought.The first is to receive the item to a QC hold location. The downside is the item will show up in on hand inventory.

A better method would be to do a PO receipt to inspection. Both Inv500 and Pur550 support this method. Now you have received the item without showing it in inventory. Only the PO quantity in inspection is updated. This method also allows you to create an Inspection Dispatch Report. After the QC process for the item is complete, then the transaction Receipt from Inspection to Stock is processed. That transaction then updates the PO quantity received field and the Item on hand field in inventory.

 

Baan/LN Tip of the Week: Transaction Accounts – Commissions

Kathy Barthelt 0 92491 Article rating: No rating

In Baan IV, if a link with Financials exists for commissions and rebates, invoices are created directly in the Commission Control System (CMS) module and posted to Financials. As a result, users must specify the ledger accounts that are used for posting commissions and rebates in the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session.

In LN, the Maintain Commission/Rebate Transaction Accounts (tdcms2101m000) session is removed from the Commission Control System (CMS) module, because invoices are no longer created directly in the Commission Control System module.

Grindmaster-Cecilware Selects NextTrack Sales For Sales Analysis

Kathy Barthelt 0 38926 Article rating: No rating

Grindmaster-Cecilware (GMCW), a leading provider of products for the food and beverage industry, has selected NextTrack Sales to satisfy their sales analysis requirements. Integrated with their Baan ERP system, NextTrack Sales provides sophisticated pivot grid and charting functionality, and the ability to generate any number of views of the data, all without customizing their ERP system. Grindmaster’s VP of Sales said it was "the perfect fit for him, and covered all of his reporting needs".

Peerless Instrument Selects Crossroads RMC for Baan Data Collection

Kathy Barthelt 0 34269 Article rating: No rating

Peerless Instrument, a division of Curtiss Wright, has selected Crossroads RMC for Baan data collection. Peerless is interested in furthering the data collection partnership that Curtiss Wright began with Crossroads RMC 20 years ago. The data collection implementation will include Receiving, Material Issue, Inspection and Report Operations Complete, and is expected to be completed in July of 2016. 

Peerless Instrument provides state-of-the-art electronic components, systems, and software to the US military. Peerless' advanced instrumentation and control systems are not only used in Navy propulsion systems but provide sophisticated monitoring systems for the gas, oil, or petrochemical industries.

BPCS/LX Tip of the Week: Inventory Control

Anthony Etzel 0 58408 Article rating: No rating
  • In Infor LX you need to determine how inventory will be moved in and out of warehouse storage locations, and which of the following transactions to use for inventory control:
  • A transfer transaction can be used to move inventory from one warehouse location to another warehouse location.
  • A production receipt transaction is used to add inventory to a warehouse location.
  • A material issue or backflush is used to reduce inventory from a warehouse location.

Baan/LN Tip of the Week: Project Templates

Kathy Barthelt 0 86299 Article rating: No rating

Project templates are useful because you can specify all of the information that you would normally want to include when creating a new project such as project structure, budget and so on.

In Baan IV/V, project templates do not exist, but you can set up a project template by creating a regular project, and setting the status to simulated or free. This is done so that the project does not create plans. Under this scenario, you can easily copy one project to another.

In LN, when you create a new project, a template can be used as the starting point. This is similar to copying a normal project, but unlike normal projects, no costs or revenues can be posted on a template.

First104105106107109111112113Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

George Moroses

Infor LX/BPCS Tips & Tricks for OPERATIONS: Multi-Level Shop Order Release Due Dates

Previously, Material Requirements Planning (MRP) preferred practices meant that the component's due date was the same as the parent's shop order release date. Because MRP trends have changed, the preference for this due date is the day before the release date of the parent. Although Infor LX already has this functionality in Shop Order Maintenance programs (SFC500), users could not change how due dates were determined for lower-level shop orders in Multi-Level Shop Order Release, SFC530D.

This enhancement provides an additional parameter for Multi-Level Shop Order Release. This parameter allows the user to change how the due date of the child components is determined. The Multi-Level Shop Order Release, SFC5302, has a new parameter for shop orders. The Due Date of Children = Release Date of Prent (Due Date of Children) field allows the user to set the due date determined for multi-level shop orders.

Print
13206 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

x

Categories