Infor LN & Baan Tip of the Week: The Production Bill of Material – 10.7

The production bill of material is globally specified at the company level. It can be used as a source for the definition of the local material lists, such as:

  • The production model in the repetitive module.
  • The production model in the job shop module.
  • The subcontracting model in the subcontracting module.

The production bill of material can be generated through the engineering bill of material. The new production bill of material differs from the old bill of material:

  • It has a header and a status.
  • It is always revision controlled.
  • The effective dates have been moved from the material lines to the header.
  • The BOM quantity has been moved from item production data to the header.
  • The use up has been moved from alternatives to the material line.
  • The material line excludes logistic data (no warehouse nor routing operation).

The production bill of material is not mandatory.

Production bill of material revisions:
The production bill of material is revision controlled. The objective of the revision is to control the changes to the bill of material over time.

The P-bom includes this revision-related data:

  • Revision number
  • Effective date and Expiry date
  • Status (New, Approved, Expired)
  • Creation date and Created by: user
  • Approval date and Approved by: user
  • Expiry date and Expired by: user
  • Source information
Previous Article IDF News: Importing LX Security into IDF
Next Article Hunter Douglas Architectural Products Selects Crossroads RMC for LN 10.6 Upgrade Project
Print
171024 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

To utilize the Security Rules Optimization feature, a system administrator can assign security codes to 100 pre-defined user groups. User groups are created in the Group Security Maintenance (SYS603) program. All users assigned to this group possess the same level of security.   

A system administrator can assign security codes for up to 100 of the user groups. All user groups over 100 are still administered by all security reject/allow rules assigned to them but are not able to utilize the optimized process. 

Each of the security codes and access levels are assigned to user groups and are mapped to the account strings and stored in the Account Cross Reference (CEA106D1) file.   

Once security codes have been assigned, the system administrator must: 

  • Determine which level each group is allowed access.

  • Determine which segment values/account strings are assigned to which user groups.

  • Create security rules for specific segment values/account strings and assign these groups to the created rules.

  • Select the rules to be processed.  Processing can be done in either batch mode or interactively.

  • The Security Rules flag must be on in the CEA Control Parameters program before any rules are effective. 

This feature provides a parameter that allows the user to enter expiration dates on the Inventory Transaction Posting screen, INV500, and Purchase Order Receipts screen, PUR5505, when they have received a lot controlled item that is not QMS controlled. This new field allows an expiration date to be entered and not overridden. A system parameter was added to Advanced Process Industries Parameters, API820D. When the parameter is set to Yes, a new lot expiration date is available in the Inventory Transaction Posting, INV500D2, and Purchase Order Receipts, PUR550D2, screens.

FirstLast

Tips: LN | Baan

Categories