A/P Payment Update in LX 8.3.4

A/P Payment Update in LX 8.3.4. ACP660B creates a file using a layout required by the bank; the file informs the bank to pay invoices. These conditions must be met to create the file:

  • FIM is an installed product in SYS821  ­
  • The user is authorized to FIM in SYS600 ­
  • The company is active in FIMCOMIT in SYS105  ­
  • The payment type is in BONPAYTP (SYS105)
Previous Article Infor LX & BPCS Tip of the Week: LX 8.4 Database
Next Article Infor LN & Baan Tip of the Week: Job Groups in LN
Print
42043 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

These programs are used to capture and post shop floor information. Labor reporting, machine time, etc. can be captured by either program. The key difference is that one will also capture the production receipt and backflush components. Based on your company information / transaction process, one of these programs will most likely be used daily to capture current shop floor data. You can use the shop packet labor ticket for the manual recording, and the keying of the data. Alternatively, you can incorporate an automated method like an MES solution to capture the data and streamline the process.

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.