Infor LX / BPCS Tips & Tricks for OPERATIONS: Auto Calculate Vendor Delivery Date

Enhances purchase order efficiency by automatically calculating the Vendor Delivery Date based on user input.

  • When a purchase order line is created, the user enters the item, order quantity, and Due Date.

  • LX automatically calculates the Vendor Delivery Date, adding buffer time for quality control, testing, and inspection activities.

  • If the Due Date is revised, an informational message prompts the user to review and potentially update the Vendor Delivery Date.

Enhancements:

  • A new PUR820 system parameter enables automatic recalculation of the Vendor Delivery Date.

  • Instead of a manual reminder, PUR500 now issues a message: “Vendor Delivery Date recalculated,” showing the updated date.

Benefits:

  • Eliminates the need to manually review and update the Vendor Delivery Date.

  • Removes the need to delete and recreate PO lines to trigger automatic date calculation.

Previous Article Infor LX/BPCS Tips & Tricks for TECHNOLOGY: User Provisioning
Next Article Infor LX/BPCS Tips & Tricks for FINANCE: Override Warning in Invoice Entry PO Costing
Print
99 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

These programs are used to capture and post shop floor information. Labor reporting, machine time, etc. can be captured by either program. The key difference is that one will also capture the production receipt and backflush components. Based on your company information / transaction process, one of these programs will most likely be used daily to capture current shop floor data. You can use the shop packet labor ticket for the manual recording, and the keying of the data. Alternatively, you can incorporate an automated method like an MES solution to capture the data and streamline the process.

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

FirstLast

Tips: LN | Baan

In typical LN REST API integrations, permissions and authorizations are not implemented or rarely used. To ensure smooth data exchange and avoid errors, it is recommended to disable the authorization and security settings.

Recommendation:

  • In the Authorization and Security Parameters session (tcsec0100m000):

    • Clear the Authorization and Security Enabled check box.

    • Clear all check boxes under Authorization Enable for on the Enabling tab.

Why This Matters:

  • Enabling authorization and security without proper setup can lead to errors and blocked transactions during integration.

  • For example, work center permissions may interfere with:

    • Creating new shifts

    • Booking machine hours

    • Read more