Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Infor LN & Baan Tip of the Week: Warehouse Blocking – LN 10.7

The functionality to block a warehouse for inbound or outbound transactions has been enhanced. A check for blocks is performed not only during receipt and shipment confirmation, but at multiple stages in the process. In addition, you can specify these blocking options for the inbound and outbound processes:

• No

• Yes

• Interactive

For example, if Blocked for Inbound is set to Yes, no inbound actions are allowed in the warehouse. Consequently, users cannot confirm receipts, generate and put away inbound advice or storage lists, and perform inbound inspections. 

If Interactive is set, during a non-automatic warehouse inbound procedure, warnings are displayed which offer the user a choice to either cancel the action or continue. Batch or automatic inbound processes continue, but the corresponding reports and logs make note of the blocking. However, in all scenarios, receipt confirmation is not allowed.

The same rules are applicable for the warehouse outbound procedure steps. The restriction for receipt confirmation also applies to shipment confirmation.

For warehouse transfer orders, not only the ship-from warehouse is checked for outbound process blocks, but also the ship-to warehouse. This prevents situations in which goods get stuck in transit due to inbound procedure blocks that apply to the destination warehouse. Now, the transfer process is already blocked during outbound.

Previous Article Partner News: Are you up to date on all of the sales tax changes that have gone into effect this year?
Next Article Consulting News: Are you familiar with your Infor LN / Baan System Log?
Print
73590 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In Infor LX, based on how your items are set up and on how you structure the Bill of Material, the following are some usages of a bill of material by functioning area:

  • Engineering & QA – change control, product design and specifications
  • Manufacturing – build instructions , material pick lists
  • Accounting – product costing
  • Materials Inventory – material and inventory planning
  • Sales – customer order processing
  • Production Scheduling – item scheduling (also a component of an MES solution)
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.
FirstLast

Tips: LN | Baan

Categories