Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

LN & Baan Tip: Unlocking Efficiency: Embrace Cycle Counting for Smoother Inventory Management

When it comes to inventory management, the term "Manual Physical Inventory" might sound accurate, but it's not the best practice by any means. Instead, consider implementing "Cycle Counting" as a more efficient approach.

Why choose Cycle Counting over a full physical inventory? The key advantage is that Cycle Counting allows you to focus on counting a selected range of stock concurrently with your regular business operations. This method streamlines inventory management, minimizing disruptions to processes related to stock receiving, consumption, and dispatching.

With Cycle Counting, you no longer need to "freeze" your operations or have your staff work long hours during holidays. You can achieve accurate inventory counts throughout the year. Crossroads RMC is here to assist you in implementing Cycle Counting efficiently and seamlessly. Contact us today to get started at 800.762.2077. Say goodbye to the dreaded three words and embrace a more efficient inventory management approach!

Previous Article LX & BPCS Tip: Unlocking Efficiency and Customization: The Power of Infor Development Framework (IDF)
Next Article Explore IDF v10's Top 10 Features with Nick Olson's Presentation from inPower 2023 - Download Now
Print
60725 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In Infor LX, based on how your items are set up and on how you structure the Bill of Material, the following are some usages of a bill of material by functioning area:

  • Engineering & QA – change control, product design and specifications
  • Manufacturing – build instructions , material pick lists
  • Accounting – product costing
  • Materials Inventory – material and inventory planning
  • Sales – customer order processing
  • Production Scheduling – item scheduling (also a component of an MES solution)
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.
FirstLast

Tips: LN | Baan

Categories