Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Anthony Etzel

The Top 5 Benefits of a Manufacturing Execution System (MES)

by PlanetTogether

MES provides the right information at the right time to show the floor manager how to optimize current conditions to improve production output.

Need 5 more reasons why you should invest in an MES system?
Read the full article by PlanetTogether:

https://www.planettogether.com/blog/the-top-5-advantages-of-a-manufacturing-execution-system

Clearly, an MES does more than simply track the amount of product coming off of your production lines. Improving your facility's efficiency begins with accurately recording production, material usage, and personnel time. Crossroads MES accomplishes this feat with ease and precision.

Previous Article Consulting News: What fields are expanded in Infor LX 8.4?
Next Article Analytics Dashboard: Reports are great, but only provide a snapshots of a specific moment
Print
37130 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

FirstLast

Tips: LN | Baan

Categories