Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC

International Wire Selects Crossroads RMC For Their High Performance Conductor Division

International Wire Group, Inc. headquartered in Camden, New York is the largest bare copper wire and copper wire products manufacturer in the United States. Crossroads has been selected to evaluate the manufacturing processes within the High Performance Conductor Division of International Wire, with locations in South Carolina and Georgia. During this evaluation, Crossroads will determine the best path for streamlining the shop floor which will include data collection and labor reporting. International currently utilizes Infor LX and will be evaluating Crossroads’ MES solution as part of this project.

Previous Article BPCS/LX TIP OF THE WEEK: INVENTORY TRANSFERS
Next Article Nice-Pak Products Drives Purchasing Power With Crossroads
Print
32381 Rate this article:
No rating
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

FirstLast

Tips: LN | Baan

Categories