OTTO Q&A from the Director of Planning & Technology at Champion Industries

1.  How difficult is it to initially install OTTO?

Dead easy is the straight answer. We relied on you to install, and you installed in the predicted 1 hour.  

2.  Would you install it on a test system or on the production system?

Production system is another easy answer. I use OTTO as the ideal prototype when talking to business contacts about “add-on” products. It is non-invasive; it only reads data from our ERP files. I know the implementation is 100% safe because no ERP files are ever updated (read corrupted) by OTTO.

3.  How difficult was it to implement OTTO? Was there a negative impact on daily operations?

There is a learning curve involved in using any new tool that has value to add. OTTO implementation is very low on the impact scale, but I would strongly recommend that a prospective client plan on investing in education and practice. OTTO implementation is low impact. No valuable tool is “no impact”.

Click here to learn more about OTTO

Previous Article Is the Crossroads Analytics Dashboard Product Better than Spreadsheets?
Next Article What do you get with IDF?
Print
30406 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Just-in-Time (JIT) is a management philosophy that focuses on minimizing the resources necessary to add value to your products and to operate your factory in ways that eliminate waste. Resources are labor, materials, equipment, space, and time. Waste is anything that does not add value to your products. Moving work-in-process from place to place, stacking and sorting, investing capital in large work-in-process and raw material inventories, inspecting materials at your vendors' sites, and tying up warehouse space with finished goods are all activities that add cost, not value, to your products. 

JIT is a process that reduces lead time. JIT does not replace an MRP, an inventory program, a scheduling technique to bypass your Master Schedule, or a materials management project. JIT is the never-ending commitment of everyone, from top management to your workers on the floor, to maximize your effectiveness through continuous, incremental improvements.

To create and maintain shop orders use SFC500 Shop Order Entry Maintenance. These orders use the standard bill of material (BOM) as the base list of components. You can also set up standard routings, which list the operations,

or work steps, involved in manufacturing.

 

To release shop orders, use the Shop Order Release program, SFC505. Infor ERP LX groups shop orders by user ID for batch processing. Use Shop Packet Print, SFC520, to print the shop orders that you select. SFC530 allows you to create multi-level shop orders to link shop orders together with a common end item parent. Linking multiple shop orders together for a final assembly product provides support for make-to-order and engineer-to-order manufacturing environments which need to schedule these multiple orders together or as a vertical slice in the production schedule.

 

You can make changes to shop orders after you print them. Use Shop Order Entry/Maintenance, SFC500, to update the shop orders. Changes are immediately visible on the inquiry screens for SFC300 and SFC350. To reprint the shop packet, use Reprint Shop Packet, SFC560.