Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Frank Petrasio

Infor M3 & Movex Tip of the Week: What inbound and outbound BODs are available for M3?

Outbound BODs from M3 to integrated applications
This table shows the BODs that are available with Infor M3. Where the product column is blank, the BOD is not currently used by interfacing products, but the BOD is generated by M3 and is available to be processed through ION and any application that is set up to receive it.

Read the full list of outbound and inbound BODs from M3 to integrated applications>

Previous Article Infor LN & Baan Tip of the Week: What is Included with Infor Operating Service (Infor OS)?
Next Article Infor M3 Webinar: Consumer Use Tax 101: What's all the fuss about for manufacturers and distributors?
Print
31719 Rate this article:
5.0
Frank Petrasio

Frank PetrasioFrank Petrasio

Other posts by Frank Petrasio

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Is Lot Control necessary?

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

How can I use an alternate item on a shop order?

The best way is to have the approved alternate item appear on the Bill of Material just after the standard item with a zero required quantity. Now the alternate item will appear on the Shop Order. So, if the standard item is not available, the alternate item can be issued to the shop order.

When the shop order is closed out, one item will have an unfavorable variance while the other shows a favorable variance. This is an easy way to provide alternate items provided engineering approves and they are part of the Bill of Material.

FirstLast

Tips: LN | Baan

Categories