Infor Moves IBM i Products to New 'Compass' Group
George Moroses

Infor Moves IBM i Products to New 'Compass' Group

IT Jungle: April 27, 2022 by Alex Woodie

Infor is taking a new approach to managing many of its IBM i-based ERP systems and supporting the customers that rely on them to run their businesses. Called Compass, the new group is tasked with revitalizing Infor’s relationships with IBM i customers by catering to their unique needs, according to the company.

Infor created the Compass group about 10 months ago,...

Read full IT Jungle Article> https://www.itjungle.com/2022/04/27/infor-moves-ibm-i-products-to-new-compass-group/

Previous Article Infor LX & BPCS Tip: Configurable Ledger (CLD) Benefits
Next Article Infor LN & Baan Tip: Company versus Site
Print
10252 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First134135136137139141142143Last

Theme picker

Tips: LN | Baan

When the originating order or order line of an outbound order line is canceled or changed, this affects the outbound order line and may impact the related outbound advice, shipments, or shipment lines.

For most order origins, warehousing order-type parameters determine whether these actions are allowed:

  1. Update the outbound order line if the originating order is changed.
  2. Cancel the originating order line and the outbound order line.
  3. Delete the canceled outbound order line.

Updating Outbound Order Lines

  • Allowed:

A serialized item is a physical occurrence of a standard item that is given a unique lifetime serial number. This enables tracking of the individual item throughout its lifetime, for example, through the design, production, testing, installation, and maintenance phases. A serialized item can consist of other serialized components.

In Service, a serialized item can be a customer-specific or owner-specific installation. Installation groups are a group of installations/serialized items such as photocopiers, computers, air conditioners, forklifts, lathe machines, and even aircraft.

A serialized item is identified by both the item code and serial number. You can set up the mask used to generate the serial numbers so the serial number includes some fields of the item data, such as the item group and the manufacturer.

In a multi-company structure, the companies can share the serialized item data. All the service departments in the various companies can refer to the same serialized items.

The serialized item can originate from a sales order or a project. The details of a serialized item indicate their origin, for example, by using specific sets of serial numbers for items that originate from sales orders and from projects. Serialized items can also originate from an as-built structure or directly from the production bill of material in Manufacturing.