BPCS/LX Tip of the Week: CEA

Anthony Etzel 0 51975 Article rating: No rating

CEA Upload provides the capability to prepare both Budgets and Journal Entries in Excel. Once the spreadsheet is complete, it can be uploaded to CEA for posting as an entry to the GL Book of choice. Ease of use is achieved and a full audit trail is created. LX users can capitalize on their investment in both CEA and Excel to achieve a better accounting process. 

Optimize Your Manufacturing Today!

3rd Hoffmaster Site Goes Lives with Crossroads MES

Anthony Etzel 0 24982 Article rating: No rating

Hoffmaster, a leading manufacturer of disposable tabletop paper products, has gone live with Crossroads MES at their Oshkosh, WI plant. This is the 3rd Hoffmaster plant that has gone live with the Crossroads MES solution, and implementation of 80 more machines is planned at this facility for later this year. Engineering drawings and other production-related documents are now immediately available at each workstation running MES, thereby increasing efficiency and accuracy in their operations.

BPCS/LX Tip of the Week: Efficiency– The What & How

Anthony Etzel 0 45670 Article rating: No rating

Efficiency is something we all strive for in our personal lives and at work. How can manufacturers increase their efficiency? Take a hard look at the 4 key areas:

  1. Planning
  2. Bill of Material and Job Accuracy
  3. Inventory Planning
  4. Real Time Reporting / Processing 

Need help figuring out how to become more efficient in each of these areas? Contact us, we’d be happy to help.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Efficiency– The What & How

Kathy Barthelt 0 70492 Article rating: No rating

Efficiency is something we all strive for in our personal lives and at work. How can manufacturers increase their efficiency? Take a hard look at the 4 key areas:

  1. Planning
  2. Bill of Material and Job Accuracy
  3. Inventory Planning
  4. Real Time Reporting / Processing 

Need help figuring out how to become more efficient in each of these areas? Contact us, we’d be happy to help.

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: Learn More About Infor’s LX Exit Points Functionality

Anthony Etzel 0 47606 Article rating: No rating

Exit Points is a new feature in Infor LX Version 8 that allows users to customize, without changing the original LX source code. Exit points provide a way for you to call an external program and pass a set of parameters to implement any needed custom logic. By using Exit Points, LX customers are able to modify the software, and still take advantage of new releases from Infor. Exit points are available in many LX programs. A complete list is available on the Infor support website.

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Top 10 Survival Tips For Manufacturers

by Guy Morgan / IndustryWeek

Kathy Barthelt 0 71045 Article rating: No rating

Under intense cost pressures, quality is at risk at many manufacturers. These 10 tips can help you survive the competitive challenges ahead.

  1. Maintain your focus. Make a decision about the kind of company you are and stick with it. 
  2. Reinvent your products regularly. Suppliers who sharply differentiate their products fare the best. 
  3. Maximize your productivity and increase your speed through enhanced product and process design. Lean manufacturing focuses on production and its associated costs from a component's conception.
First91929394969899100Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

George Moroses

Infor LX/BPCS Tips & Tricks for TECHNOLOGY: Setting Up User Groups (CEA)

To utilize the Security Rules Optimization feature, a system administrator can assign security codes to 100 pre-defined user groups. User groups are created in the Group Security Maintenance (SYS603) program. All users assigned to this group possess the same level of security.   

A system administrator can assign security codes for up to 100 of the user groups. All user groups over 100 are still administered by all security reject/allow rules assigned to them but are not able to utilize the optimized process. 

Each of the security codes and access levels are assigned to user groups and are mapped to the account strings and stored in the Account Cross Reference (CEA106D1) file.   

Once security codes have been assigned, the system administrator must: 

  • Determine which level each group is allowed access.

  • Determine which segment values/account strings are assigned to which user groups.

  • Create security rules for specific segment values/account strings and assign these groups to the created rules.

  • Select the rules to be processed.  Processing can be done in either batch mode or interactively.

  • The Security Rules flag must be on in the CEA Control Parameters program before any rules are effective. 