Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC, in partnership with Infor, takes Yupo to LX 8.3.4

Crossroads RMC 0 28306 Article rating: 5.0

Yupo Corporation, a leader in synthetic paper, with products that are 100% recyclable, waterproof and tree-free, went live on Infor LX 8.3.4 on April 3, 2017. Yupo partnered with Crossroads RMC for this important technology upgrade. Included in the implementation were the Finance, Supply Chain, Manufacturing and Plant Maintenance (EAM) modules.

Crossroads RMC Takes Polar to LX 8.3.4

Crossroads RMC 0 30856 Article rating: No rating

Polar Beverages, the largest independent soft drink bottler in the United States, went live on Infor LX 8.3.4 on January 16, 2017. Polar partnered with Crossroads RMC for this important technology initiative. Included in the implementation were the Finance Supply Chain and Manufacturing modules. Phase 2 will include Adirondack Beverages, a subsidiary of Polar. This project will begin in Q3 2017.

BPCS/LX Tip of the Week: Handwritten Inventory Tickets

Anthony Etzel 0 46654 Article rating: No rating

Are you still using handwritten tickets for your inventory?  This method of inventory tracking is slow and prone to human error.

Putting a simple barcode system in place speeds up the process of tracking inventory movements, reduces the likelihood of mistakes, and creates a recorded history of the who/what/where that can provide valuable insight to those who make critical business decisions for your business.

Not sure where to start? Contact us and we’d be happy to help you take the first step.

Baan/LN Tip of the Week: Ledger Default Account

Kathy Barthelt 0 70748 Article rating: No rating

If you do not wish to define a detailed mapping to various ledger accounts for specific integration transactions, you can map the corresponding integration document type to a default account. All the transactions of the integration document type for which an account cannot be determined based on the mapping scheme details, are posted to the default account.

 

The mapping of an integration document type to a default account is direct, without the need for element groups and mapping elements. No distinction is made on any of the transaction details.

 

Default accounts can be used in two ways:

  • Instead of a detailed mapping to various ledger accounts. All the transactions are posted to the same account. For example, all warehouse receipts are posted to the Inventory ledger account, without any distinction.
  • In addition to a detailed mapping. If a transaction cannot be mapped based on the detailed mapping scheme, it is posted to the default account.

BPCS/LX Tip of the Week: Email Distribution Lists

Anthony Etzel 0 47348 Article rating: No rating

Email Distribution Lists are new in Infor LX Version 8.

With this feature, users can create groups to which they may add internal or external email addresses, and in turn, use the name of the group when sending out the email.

The email distribution list eliminates the need for a program change if recipients need to be added to or deleted from the group. 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: Clusters in LN

Kathy Barthelt 0 69846 Article rating: No rating

A cluster is a group of one or more warehouses in a particular geographical area. You can plan an item by cluster (geographical area).

To enable this, you can set up multiple plan items for one item. You always define one plan item without a cluster indication and multiple plan items with a cluster indication. A plan item with a cluster is called a clustered plan item, and a plan item without cluster is called the non-clustered plan item.

The plan items in the clusters can be supplied not only by distribution, but also through purchase and production. In this way, you can, for example, plan local purchasing in a cluster (geographical area). You can also plan supply from multiple sources.

 

Optimize Your Manufacturing Today!

BPCS/LX Tip of the Week: When More = Less

Anthony Etzel 0 46298 Article rating: No rating

Do you have bottlenecks in your process due to product changeovers or breakdowns?
Maybe the answer is adding redundancy in the department where you are experiencing the problem. A duplicate machine setup can allow for double the capacity during high production periods. It can also eliminate the need to swap out tools or other materials due to different production runs. When breakdowns occur, equipment can be swapped out to keep production moving while repairs are being made.

Planning for this keeps production levels high.

 

 

Optimize Your Manufacturing Today!

Baan/LN Tip of the Week: When More = Less

Kathy Barthelt 0 71351 Article rating: No rating

Do you have bottlenecks in your process due to product changeovers or breakdowns?

Maybe the answer is adding redundancy in the department where you are experiencing the problem. A duplicate machine setup can allow for double the capacity during high production periods. It can also eliminate the need to swap out tools or other materials due to different production runs. When breakdowns occur, equipment can be swapped out to keep production moving while repairs are being made.

Planning for this keeps production levels high.

 

 

 

Optimize Your Manufacturing Today!

First9091929395979899Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

George Moroses
/ Categories: Infor LX & BPCS Tips

Infor LX/BPCS Tips & Tricks for EXECUTIVES:

FINANCE TIP:

IDF Ledger Book Journal Line Analysis

  1. This enhancement added the IDF Ledger Book Journal Line Analysis business object for displaying reference information on summarized journal lines. This enhancement provided Ledger Book Journal Line Analysis business object and a bi-directional relationship to Ledger Book Journal Line Source.
  2. This enhancement provides the user with detailed reference information on summarized journal lines for analysis purposes.

TECHNOLOGY TIP:

Improve WebTop Grid Support for MRP320D Master Schedule Detail Inquiry

This enhancement improved the subfile utilized in MRP320D Master Schedule Detail Inquiry -SCR001 by expanding the subfile with data rather than clearing the subfile as user pages. This change provides full support for the WebTop 4.8 Grid decorator.

This enhancement updated the approach used to populate the subfile to allow a deployed Webtop Grid to function correctly. There is no visible or user-impacted change to the way the program functions.

This enhancement provides improved functionality and full support of a Webtop grid applied to the subfile.


OPERATIONS:

Override inspection days lead time at item-facility

  • Item Facility Master now has new attribute to define the override inspection days lead time CICP.ICINSD.
    • When an item facility has a defined override inspection days lead time, that value will be used instead of the system parameter inspection days lead time.

MRP exception report, MRP200B
Purchase planning report, PUR285B
Purchase order / Requisition maintenance, PUR500D3
Purchase order consolidation / release, PUR640B1
Vendor splits, PUR653B

Print
4118 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

x

Categories