Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LX & BPCS Tip of the Week: Partial Search in Item Description List

Anthony Etzel 0 57596 Article rating: 5.0

Previously, if a user performed a partial search for an item by using a double byte language, no matches were found. Regardless of whether the MLS module is used, this enhancement allows a user to use a double byte language to perform partial or full item description searches. This enhancement resolves an issue with partial searches on screens where the Item Master Lookup (WINIIM) screen is used, such as Material Status Inquiry, INV300D-01, Item Master Selection INV100D1-01, Facility Planning Selection, MRP140D1-01, and Purchasing Inquiry, PUR300D1).

The user selects the F4 prompt from these screens to open the Item Description List. In the prompt window, the user specifies option 10 to perform a partial or full search on an item description.

What does OTTO do that finite scheduling doesn’t?

Anthony Etzel 0 31752 Article rating: 5.0

Finite scheduling identifies what constraints need to be overcome and it provides the best schedule given the constraints. But the objective is not only to overcome or remove the constraint but to prevent the constraint from even occurring. Only people can anticipate and overcome current constraints, and this requires time for analysis and people to apply their knowledge to the data. OTTO removes the non-value-added tasks of extracting and manipulating data and provides visibility to support people in solving near-term, complex problems. 

Crossroads RMC welcomes MBL (USA) Corporation

Anthony Etzel 0 31119 Article rating: 5.0

Crossroads RMC welcomes MBL (USA) Corporation as our newest Data Collection and Warehouse Management client.

MBL (USA) Corporation, with headquarters located in Ottawa, Illinois, manufactures all types of V-Belts, V-Ribbed Belts, Timing Belts, and Variable Speed Belts for both original equipment and service parts in the automotive, recreational, and industrial markets. In addition to supplying North, Central and South America markets, products are exported to countries worldwide. Their corporate parent is Mitsuboshi Belting LTD located in Japan.

MBL (USA) Corporation’s objective was to improve inventory visibility, eliminate paperwork, and use a bar code scanning solution to manage warehouse inventory and eliminate the manual process for inventory warehouse transactions.

Our discovery was able to highlight improvements to streamline the process in the warehouse and improve inventory visibility. Crossroads RMC is a reseller and support partner for TouchPath Warehouse Management which is integrated to MBL (USA) Corporation’s ERP/LX software. TouchPath Warehouse Management provides the insight into your inventory and the warehouse management tools to help you increase customer satisfaction and reduce costs.

We are proud to have MBL (USA) Corporation as our newest client and look forward to being a strategic partner and support their company growth and success.

Infor LX & BPCS Tip of the Week: Inventory Transfers for Outside Operations

Anthony Etzel 0 58513 Article rating: 5.0

This enhancement allows users who currently perform outside operation processing in shop floor programs to manage the transfer of components used in the outside operations to the vendor’s designated warehouse.

This enhancement provides modified and new INV511D screens and adds new logic to allow the user to identify all shop orders that have components linked to outside operations or to identify all the components linked to an outside operation on a shop order. The shop orders can be filtered by either a date range or by a specific vendor.

Inventory Transfers for Outside Operations enhances the management of external operations by providing screens that simplify the selection of the shop orders or items to transfer to a vendor.

Transfers to the vendor warehouse are performed in the Inventory Transfers, INV511D, screens.

Infor LX / BPCS Tip of the Week: Optional Authority to Maintain Reason Codes

Anthony Etzel 0 54628 Article rating: 5.0

This enhancement allows users to update Reason Code Maintenance, INV140D1, for Transaction Effects that they are not authorized to in any other programs. A new system parameter was added to Inventory Parameters, INV820D. The enhancement allows users who do not actually perform transactions in Infor LX to maintain the reason codes for the transactions.

Infor LN / Baan Tip of the Week: Deleting Records

Kathy Barthelt 0 81173 Article rating: 5.0

To improve performance and reduce database growth, deleting records is highly effective. The disadvantage of deleting records is that data is no longer available. Usually, however, not all records need to be saved. For example, line activities are stored by warehouse. Normally, you do not need to keep these records. Therefore, after closing a warehouse order, line activities can be removed. The User's Guide for ERP LN Archiving describes several sessions you can use to delete old data. Other data such as items and business partners can be reviewed once in a while, after which you can delete the data you no longer need. For every order and contract table a session is available to archive and delete old orders. In these sessions, you can specify several characteristics to select the orders to be removed, such as date or status. Run these sessions on a regular basis.

Explore your IDF programs

Anthony Etzel 0 33609 Article rating: 5.0

If you haven't already, you may want to start to explore your IDF programs. Currently they provide the replacement for the 300 series inquiry programs. In addition, navigation drill downs are far superior to any green screen presentation of the data.

First6768697072747576Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Introducing VJES (Visual Job Execution Software)

You would be hard-pressed to completely miss the stories in the news recently about quality issues in manufacturing. The crux of the issue has been a complete focus on production and a lack of focus on quality. Yes, it is a wonderful thing to get the goods out the door, but when you’re sacrificing quality, what good is it really?

There are specifications for production for a reason. Engineering exists for a reason. If products are not built according to exact design specifications, scrap is likely to go up, rework goes up, customer returns and/or service requests go up, and customer satisfaction and overall customer confidence in your product plummets.

Is all of that worth it to get the good out the door in the shortest amount of time possible?

Every manufacturer relies on a few core measurements to manage their operations. Measurements like efficiency, productivity, capacity, labor and equipment utilization are used by manufacturers across the globe to benchmark performance and assess the effectiveness of processes.

Quality needs to be part of that mix. Because measurements like efficiency and productivity don’t necessarily mean high quality, incorporating ways to ensure quality from the start can help to eliminate waste and rework.

Manufacturing quality is achieved through quality control using documented, repeatable, and measurable processes.

What if you could incorporate quality control in every operation, at every work center to not only ensure high-quality finished goods but also simultaneously train high-quality operators?

Introducing Crossroads’ ERP independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface between engineering and the paperless manufacturing floor. VJES makes available only one version of the work instructions – the RIGHT one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES gives production personnel the best opportunity to build it right the first time and provides a way to track worker productivity during the build at every step.

VJES Overview

VJES achieves RESULTS:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improvement of quality score from 68/100 to 93/100 in 12 months
  • During the first month of use, employee training timeframe improved from 1 week, to 3 days.
  • First pass yield percentage at 100% for 8 months straight this year.
  • Able to incorporate a quality cell after productivity increased due to newfound bandwidth received when adopting VJES.


Request a demo or Contact us to learn more.

Print
18878 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories