Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

The Top 5 Benefits of a Manufacturing Execution System (MES)

by PlanetTogether

Anthony Etzel 0 37599 Article rating: 5.0

MES provides the right information at the right time to show the floor manager how to optimize current conditions to improve production output.

Need 5 more reasons why you should invest in an MES system?
Read the full article by PlanetTogether:

https://www.planettogether.com/blog/the-top-5-advantages-of-a-manufacturing-execution-system

Clearly, an MES does more than simply track the amount of product coming off of your production lines. Improving your facility's efficiency begins with accurately recording production, material usage, and personnel time. Crossroads MES accomplishes this feat with ease and precision.

Infor LX & BPCS Tip of the Week: Trim Leading Zero

George Moroses 0 61426 Article rating: 5.0

In LX 8.4, an enhancement has been included to allow for the expanded Company fields to have the leading zero truncated.

To trim leading zeros, CEA515B is called during macro resolution to trim the leading zero based on the position in the Zero Trim file (GZT). The Zero Trim file contains all the company number fields currently defined in the CEA Cross Reference fie (GXM).

This enhancement provides year over year comparison in financial reports and eliminates the need to setup new companies in programs such as Alias Definition. Financial programs trim the leading zero on Company fields, such as Company 010, on subsystem transactions to process as Company 10 during CEA macro resolution. Clients who prefer to retain the Company value as 010 on financial reports can clear the GZT file.

Infor LN & Baan Add-ons: Need a reason why you should barcode your inventory? How about 8 reasons!

Kathy Barthelt 0 34276 Article rating: 5.0

Top Eight Benefits of Barcodes

Barcodes are often overlooked as a method for cutting costs and saving time. A valuable and viable choice for businesses looking to improve efficiency and reduce overhead, barcodes are both cost-effective and reliable.

Crossroads RMC offers RMClabel which can be tied to any data collection system, or run stand-alone. Create barcode labels with 1D

Infor LN & Baan: Data Collection

Be honest. Does your business REALLY operate in real time?

Kathy Barthelt 0 40549 Article rating: 5.0

Do you have up-to-date real-time information on labor, machine time, and parts consumed? How accurate is your data? Can you get an accurate picture of what is going on across your operations at any time?

If not, Crossroads data collection solution should be considered. By combining sessions, eliminating duplicate entries and using available information to complete a transaction, Web Collect, formerly RMC3 extends the Infor LN and Baan applications to ensure efficiencies and timely information flow and reporting. 

Consulting News: Are you familiar with your Infor LN / Baan System Log?

Kathy Barthelt 0 38873 Article rating: 5.0

Data about the system and the application is stored in a system log. The system data includes information about:

  • The application environment
  • Any reorganization of tables
  • The available free disk space
  • The back-up schedule
  • The user data reports
  • The updates
  • Changes in the system
  • The error messages and solutions

Are you comfortable with reading your ERP system log? Have you checked it lately? Need help interpreting if your system may have a problem? Contact Kathy Barthelt today and one of our expert technical consultants can help to put your mind at ease and make sure your system is running as it should.

Infor LN & Baan Tip of the Week: Warehouse Blocking – LN 10.7

Kathy Barthelt 0 74450 Article rating: 5.0

The functionality to block a warehouse for inbound or outbound transactions has been enhanced. A check for blocks is performed not only during receipt and shipment confirmation, but at multiple stages in the process. In addition, you can specify these blocking options for the inbound and outbound processes:

• No

• Yes

• Interactive

For example, if Blocked for Inbound is set to Yes, no inbound actions are allowed in the warehouse. Consequently, users cannot confirm receipts, generate and put away inbound advice or storage lists, and perform inbound inspections. 

If Interactive is set, during a non-automatic warehouse inbound procedure, warnings are displayed which offer the user a choice to either cancel the action or continue. Batch or automatic inbound processes continue, but the corresponding reports and logs make note of the blocking. However, in all scenarios, receipt confirmation is not allowed.

The same rules are applicable for the warehouse outbound procedure steps. The restriction for receipt confirmation also applies to shipment confirmation.

For warehouse transfer orders, not only the ship-from warehouse is checked for outbound process blocks, but also the ship-to warehouse. This prevents situations in which goods get stuck in transit due to inbound procedure blocks that apply to the destination warehouse. Now, the transfer process is already blocked during outbound.

Partner News: Are you up to date on all of the sales tax changes that have gone into effect this year?

Crossroads RMC 0 34373 Article rating: 5.0

Like it or not, requirements for collecting sales tax change monthly and keeping up with those changes requires someone to be “on it” full time. Fortunately, Avalara handles all of that. Learn How >

Contact us to learn how we can take this burden off your plate and ensure that you are 100% in compliance, 100% of the time.

First5960616264666768Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Introducing VJES (Visual Job Execution Software)

You would be hard-pressed to completely miss the stories in the news recently about quality issues in manufacturing. The crux of the issue has been a complete focus on production and a lack of focus on quality. Yes, it is a wonderful thing to get the goods out the door, but when you’re sacrificing quality, what good is it really?

There are specifications for production for a reason. Engineering exists for a reason. If products are not built according to exact design specifications, scrap is likely to go up, rework goes up, customer returns and/or service requests go up, and customer satisfaction and overall customer confidence in your product plummets.

Is all of that worth it to get the good out the door in the shortest amount of time possible?

Every manufacturer relies on a few core measurements to manage their operations. Measurements like efficiency, productivity, capacity, labor and equipment utilization are used by manufacturers across the globe to benchmark performance and assess the effectiveness of processes.

Quality needs to be part of that mix. Because measurements like efficiency and productivity don’t necessarily mean high quality, incorporating ways to ensure quality from the start can help to eliminate waste and rework.

Manufacturing quality is achieved through quality control using documented, repeatable, and measurable processes.

What if you could incorporate quality control in every operation, at every work center to not only ensure high-quality finished goods but also simultaneously train high-quality operators?

Introducing Crossroads’ ERP independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface between engineering and the paperless manufacturing floor. VJES makes available only one version of the work instructions – the RIGHT one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES gives production personnel the best opportunity to build it right the first time and provides a way to track worker productivity during the build at every step.

VJES Overview

VJES achieves RESULTS:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improvement of quality score from 68/100 to 93/100 in 12 months
  • During the first month of use, employee training timeframe improved from 1 week, to 3 days.
  • First pass yield percentage at 100% for 8 months straight this year.
  • Able to incorporate a quality cell after productivity increased due to newfound bandwidth received when adopting VJES.


Request a demo or Contact us to learn more.

Print
19240 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories