Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

Kathy Barthelt 0 100852 Article rating: 5.0

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)

George Moroses 0 49792 Article rating: 5.0

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT

Welcome to Our New Website - Please Take a Look Around!

Crossroads RMC 0 43037 Article rating: 5.0

We proudly announce the launch of Crossroads RMC’s brand new website!

We have been fortunate to serve customers for over 30 years and over that time, we have developed software solutions and consulting expertise to become your Go-To Experts for Infor LN / Baan, and Infor LX / BPCS and M3. 

Our website design focuses on our products and services simply and succinctly, while accentuating the reasons why working with Crossroads RMC has been the right choice for so many manufacturers and distributors worldwide. 

So come on in and take a look around! We hope you enjoy the new site and explore all of the information it has to offer.

If you think our new website is COOL, please leave a comment!If you think our new website is COOL, please leave a comment! 

Keep up-to-date with our latest announcements, industry news, and Infor ERP tips here on Crossroads Connections, Subscribe to our bi-monthly Newsletter and follow us on Facebook, LinkedInTwitter and YouTube.

Infor will no longer support LX or BPCS on IBM i 7.2 after April 30, 2021

George Moroses 0 50106 Article rating: 5.0

On September 10, 2019, IBM® announced the end of support of IBM i 7.2 effective April 30, 2021. In line with IBM’s support policy, Infor will no longer support LX, BPCS, SSAEAM, PRMS, BOSS and related products on IBM i 7.2 after April 30, 2021.

All releases, patches, and solutions are expected to be delivered and compiled for IBM i 7.3 effective May 1, 2021. These deliverables should install and function on version 7 release 3 (IBM i 7.3) and above. This will require that your operating system be at a minimum release level of IBM i 7.3.

This policy extends to other Infor LX related technologies including WebTop, System i Workspace (SIW), and Infor Development Framework (IDF).

If you have not done so already, we recommend you start planning and completing your upgrade to IBM i 7.3 or above prior to April 30, 2021. After this date, if you register a support call with Infor Support, and your application still runs on IBM i 7.2, you may be requested to upgrade to a supported version of the IBM i operating system.

In addition, we invite you to log on to Infor Concierge to view and download important information regarding Infor LX, BPCS, and Infor SSAEAM. General KB Articles have been created to proactively provide you with information regarding this Announcement (1397381) and the Infor BPCS/LX Product Lifecycle Policy (1947086).

Infor LX & BPCS Tip of the Week: Journal Upload – EGLi

George Moroses 0 52442 Article rating: 5.0

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

Infor LN & Baan Tip: Open Transactions Check – LN 10.7

Kathy Barthelt 0 56990 Article rating: 5.0

When closing a project, users were informed about open transactions blocking the closure process. To proactively check on open transactions, the Show Open Transactions option has been introduced in the Project Status (tppdm6107s000) session. With this option, issues can be resolved before changing the status.

First5051525355575859Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Introducing VJES (Visual Job Execution Software)

You would be hard-pressed to completely miss the stories in the news recently about quality issues in manufacturing. The crux of the issue has been a complete focus on production and a lack of focus on quality. Yes, it is a wonderful thing to get the goods out the door, but when you’re sacrificing quality, what good is it really?

There are specifications for production for a reason. Engineering exists for a reason. If products are not built according to exact design specifications, scrap is likely to go up, rework goes up, customer returns and/or service requests go up, and customer satisfaction and overall customer confidence in your product plummets.

Is all of that worth it to get the good out the door in the shortest amount of time possible?

Every manufacturer relies on a few core measurements to manage their operations. Measurements like efficiency, productivity, capacity, labor and equipment utilization are used by manufacturers across the globe to benchmark performance and assess the effectiveness of processes.

Quality needs to be part of that mix. Because measurements like efficiency and productivity don’t necessarily mean high quality, incorporating ways to ensure quality from the start can help to eliminate waste and rework.

Manufacturing quality is achieved through quality control using documented, repeatable, and measurable processes.

What if you could incorporate quality control in every operation, at every work center to not only ensure high-quality finished goods but also simultaneously train high-quality operators?

Introducing Crossroads’ ERP independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface between engineering and the paperless manufacturing floor. VJES makes available only one version of the work instructions – the RIGHT one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES gives production personnel the best opportunity to build it right the first time and provides a way to track worker productivity during the build at every step.

VJES Overview

VJES achieves RESULTS:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improvement of quality score from 68/100 to 93/100 in 12 months
  • During the first month of use, employee training timeframe improved from 1 week, to 3 days.
  • First pass yield percentage at 100% for 8 months straight this year.
  • Able to incorporate a quality cell after productivity increased due to newfound bandwidth received when adopting VJES.


Request a demo or Contact us to learn more.

Print
19817 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories