Infor LX & BPCS Tip of the Week: Production History Purge

George Moroses 0 40036 Article rating: 5.0

Did you know that you can clear production history?

JIT900 - Production History Purge

To clear field values from Production History Inquiry (JIT300). Run monthly as Day End Run and Month End Run which clears M-T-D fields.  There is an option to clear the average per hour and maximum per hour fields. This program can be run as often as you wish.

Infor M3 Tip: Personalization Tools in M3: Setting a field to be mandatory

Frank Petrasio 0 42941 Article rating: 5.0

This procedure describes how to make a field mandatory. A mandatory field must be completed by specifying a value. If this field is left blank, the user cannot proceed to the next panel or form.

  1. Go to the detail panel of a program.
  2. Choose the input field that you want to be mandatory. Right-click the field and select Personalize > Enable Mandatory.

Note: An asterisk (*) beside the field indicates that the field is mandatory. To disable the feature, right-click the field and select Personalize > Disable Mandatory.

Partner News - Avalara/AvaTax for Infor LX | BPCS | LN | Baan | M3

Crossroads RMC 0 44359 Article rating: 5.0

Considering tax compliance, but not sure if it’s the right time?

We know that many businesses are facing financial difficulties and need to make hard decisions.

Our partners at Avalara are offering 90 days of free US tax automation for all new AvaTax customers. This means you can implement AvaTax into your Infor product, shopping cart, billing system, etc, without having to pay anything for three months. Learn more>

Tax exempt? Avalara can automate that process too. Focus on what really matters right now, like managing cash flows, and driving revenue initiatives, and leave the tax compliance piece fully automated. 

Infor LX & BPCS Support News

Frank Petrasio 0 45472 Article rating: 5.0

As of December 31, 2021, Infor LX 8.3.3 and earlier, along with ALL versions of BPCS will move to sustaining maintenance.

What does that mean?

If you are on LX 8.3.3 or earlier, or any version of BPCS, your ERP will not be supported by Infor. NO new updates, NO new fixes, regardless of the severity of the issue.

We understand that your situation may not fall into the category of a one-size-fits-all solution, so we are here to tell you that our consultants will work with you to find a solution that works for your people and makes the most sense for your business.

Contact Frank Petrasio to discuss how the latest version of Infor LX can benefit your business. 

800.762.2077 or click here to request a free phone consultation.

Infor LX & BPCS Tip of the Week: Fast Line Entry

George Moroses 0 51738 Article rating: 5.0

LX Order Entry has been enhanced to provide a new Fast Line Entry panel. The new presentation makes traditional order entry faster by reducing the keystrokes necessary to create new lines. It also places the item description on the primary entry line, making it easier to confirm that the desired item has been ordered as each line is validated.

Impact:

ORD700DA – Fast Line Entry
ORD700D2 – Order Line Entry, Quote Line Entry and RMA Line Entry

Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant

Crossroads RMC 0 71658 Article rating: 5.0

No matter how large or small your manufacturing plant is, efficiency and productivity relative to your capital investment are the keys to maintaining your competitive edge. Wasting time and money is not something anyone wants to do, but manufacturers need to be especially mindful of both and actively work to address any issues that lead to productivity or financial loss.

Source: https://www.onupkeep.com/blog/improve-production-efficiency/

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

Kathy Barthelt 0 100623 Article rating: 5.0

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

First4950515254565758Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Anthony Etzel

How to Improve Customer Shipments With OTTO - A Case Study

Setting Industry Service Standards

Shenandoah Manufacturing, a $20 million producer of poultry-raising equipment (heaters and brooders), had been having difficulty for some time shipping orders to customers in a timely manner. They had successfully implemented a popular ERP system and had been using it for more than 3 years, yet the situation didn't improve. 

Customer Service Representatives were complaining about the frequent backorders and late orders. Employees were giving it their best effort, but were frustrated, and customers were threatening to take their business elsewhere.

The company considered installing an APS system as a possible solution, but found implementation would be difficult, expensive, and running the system might be a challenging task as a number of key business practices would have to be changed. A consultant familiar with OTTO suggested they look at that product as an alternative to APS. Several OTTO aspects cited by the consultant convinced them to consider a cursorily review. Specifically:

  • The non-intrusive nature of the product.
  • It's relative inexpensive initial investment.
  • The low overall total cost of ownership.
  • The integration with their ERP system.

The initial demonstration was impressive. OTTO was installed on Shenandoah's server within 45 minutes of arrival and, most impressively, it was fully functional with their real “live” data immediately. Needless to say, the demo was well received. Even more importantly Shenandoah was able to “test drive” the software to prove its applicability before making any dollar commitments.

According to Mark Shank, Information Systems Manager, some baseline measurements were made last year, and it was determined that approximately 50% of their customer orders had shipped on time. As they began using OTTO, on-time order performance rose to 90% for the month. And Shenandoah caught up on its entire backlog and started working ahead on February's orders. In February on-time shipment performance jumped to 92% and subsequently on-time performance has ranged somewhere between 98.3% and 99.5% — well above the 96% goal set by Management.

OTTO provides the means for keeping the whole production organization focused on the few things that have to happen as the ship date approaches to get each order shipped on time. Components that have the potential for delaying an order are identified so they can be managed. Shenandoah's staff, a precious and limited resource, now concentrates on analyzing information and managing the right things at the right time rather than digging out date. To quote one production control individual: “what use to take hours now takes seconds.”

According to Roy Hackett, Plant Manager: "Knowing the right things to pay attention to at the right time — information provided by OTTO — has allowed on-time shipping to be improved by 40 percentage points in less than one month and a lead time reduction from 3-4 weeks to 1-2 weeks on the most important products"

Guessing at what and how much of the work being processed is for real customer orders versus planned orders is eliminated which is especially important when capacity is short during the heavy portion of the business cycle. 

“By focusing on the right things at the right time, production expedites and interruptions are far fewer, production flow is much smoother and productivity is significantly improved.”