Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor M3 Tip: Personalization Tools in M3: Setting a field to be mandatory

Frank Petrasio 0 42920 Article rating: 5.0

This procedure describes how to make a field mandatory. A mandatory field must be completed by specifying a value. If this field is left blank, the user cannot proceed to the next panel or form.

  1. Go to the detail panel of a program.
  2. Choose the input field that you want to be mandatory. Right-click the field and select Personalize > Enable Mandatory.

Note: An asterisk (*) beside the field indicates that the field is mandatory. To disable the feature, right-click the field and select Personalize > Disable Mandatory.

Partner News - Avalara/AvaTax for Infor LX | BPCS | LN | Baan | M3

Crossroads RMC 0 44303 Article rating: 5.0

Considering tax compliance, but not sure if it’s the right time?

We know that many businesses are facing financial difficulties and need to make hard decisions.

Our partners at Avalara are offering 90 days of free US tax automation for all new AvaTax customers. This means you can implement AvaTax into your Infor product, shopping cart, billing system, etc, without having to pay anything for three months. Learn more>

Tax exempt? Avalara can automate that process too. Focus on what really matters right now, like managing cash flows, and driving revenue initiatives, and leave the tax compliance piece fully automated. 

Infor LX & BPCS Support News

Frank Petrasio 0 45376 Article rating: 5.0

As of December 31, 2021, Infor LX 8.3.3 and earlier, along with ALL versions of BPCS will move to sustaining maintenance.

What does that mean?

If you are on LX 8.3.3 or earlier, or any version of BPCS, your ERP will not be supported by Infor. NO new updates, NO new fixes, regardless of the severity of the issue.

We understand that your situation may not fall into the category of a one-size-fits-all solution, so we are here to tell you that our consultants will work with you to find a solution that works for your people and makes the most sense for your business.

Contact Frank Petrasio to discuss how the latest version of Infor LX can benefit your business. 

800.762.2077 or click here to request a free phone consultation.

Infor LX & BPCS Tip of the Week: Fast Line Entry

George Moroses 0 51682 Article rating: 5.0

LX Order Entry has been enhanced to provide a new Fast Line Entry panel. The new presentation makes traditional order entry faster by reducing the keystrokes necessary to create new lines. It also places the item description on the primary entry line, making it easier to confirm that the desired item has been ordered as each line is validated.

Impact:

ORD700DA – Fast Line Entry
ORD700D2 – Order Line Entry, Quote Line Entry and RMA Line Entry

Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant

Crossroads RMC 0 71625 Article rating: 5.0

No matter how large or small your manufacturing plant is, efficiency and productivity relative to your capital investment are the keys to maintaining your competitive edge. Wasting time and money is not something anyone wants to do, but manufacturers need to be especially mindful of both and actively work to address any issues that lead to productivity or financial loss.

Source: https://www.onupkeep.com/blog/improve-production-efficiency/

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

Kathy Barthelt 0 100574 Article rating: 5.0

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)

George Moroses 0 49641 Article rating: 5.0

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT
First4849505153555657Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Crossroads RMC

Improve Profit and Cut Costs at the Same Time

Want to Improve Profit and Cut Costs at the Same Time?

“Real-time executives averaged a 14% improvement in operating cash flow and achieved a 6% reduction in operating costs” According to the Aberdeen Group.

So, how do you accomplish this great feat? By streaming real-time data to the executives.

The need for visibility into what is happening in the trenches, and the comprehensive understanding of key metrics and their implications for overall performance, are critical for an organization to be at the “top of their game”.   read full article>

Learn how Crossroads RMC can provide for this data streaming with Analytics Dashboards.

Print
41944 Rate this article:
No rating
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

x

Categories