Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

CROSSROADS MES VERSION 11.2 RELEASED

Anthony Etzel 0 32701 Article rating: 5.0

Crossroads RMC is proud to announce the official release of Crossroads MES Version 11.2

Included in this release are many new features including: Priority Code Display, Capacity Load Balancing, Indirect Time Reporting, T.L Ashford Label Integration, In-Line Label Validation, and a new XML Dashboard Interface. 
Improvements have been made to the ERP Interface, Manual Labor Time Capture, Parts List Display, Setup Operation, and End of Shift Review.

Crossroads MES for BPCS/LX has been around since 1995. Your input is important to us. Many of our improvements and functions come from your requests, so please share your ideas.

Future Functionality Coming Soon!

  • Employee/Shop Order Efficiency
  • IDF Reporting
  • Field Size Expansion
  • Non-windows tablet version

Click here for more details

Crossroads MES – The Shining Star of Hoffmaster’s Move to LX

Anthony Etzel 0 37291 Article rating: No rating

When Hoffmaster finally flipped the switch on its ERP migration at the end of February, the IT director was nervous. Not only was the paper-goods supplier consolidating a manufacturing site on Infor ERP LX, but it was also replacing an old shop floor reporting system with a new one from Crossroads RMC. There was a lot that could go wrong for the IBM i shop.

"When we weighed all of our products, Crossroads RMC pretty much convinced us their product was plug and play and their integration back to LX was solid as a rock, and they were right..." the IT director says.

Click Here to Learn about Hoffmaster’s move to Infor LX and their implementation of the Crossroads MES solution.

Hoffmaster Clintonville Plant Goes Live with Crossroads MES & LX

Anthony Etzel 0 32857 Article rating: No rating

On March 1, 2016, Hoffmaster’s Clintonville plant went live with Crossroads MES and LX. The goal of the project was to convert from another ERP to LX and replace a green screen MES system that required the manual recording of production and labor activity keyed from shop floor terminals.

Hoffmaster achieved their goal by completing a successful data conversion and detailed prototyping of LX and Crossroads. The project team remarked that the Crossroads MES implementation was by far the easiest part of the project. One of the critical requirements of the chosen MES solution was to verify UPC and UCC label formats that called for in-line labeling of product packages and cases. Crossroads MES satisfied that requirement, and also provided an interface to finished goods inventory via the scanning of LPN numbers when reporting production.

The Clintonville plant is a leading manufacturer of disposable tabletop products.

Morrison Brothers Goes Live With Crossroads MES in Record Time!

Crossroads RMC 0 32334 Article rating: No rating

On February 18, 2016, the Maquoketa plant of Morrison Brothers went live with the Crossroads MES solution. The goal was to remove all the shop floor paperwork and eliminate the manual recording of production and labor. The company achieved this goal in just 96 days from project kick-off to go live. Included in the go-live was the ability to deliver drawings electronically to the Crossroads MES workstations. This was a critical component of the implementation as it ensured that each workstation would always be operating off the latest revision of the engineering documents.

A rollout of the Crossroads MES solution is planned for Morrison’s Dubuque plants later this year. 

Morrison Brothers is a major producer of petroleum marketing equipment in the United States and abroad.

123456

Tips:  LX | BPCS | M3

Tips: LN | Baan

Use this session to to define which fields must be audited, and when they must be audited.

Note: 

  • It is not required to define the fields that must be audited. Only if not all fields in a table must be audited, you must specify the fields that must be audited. You can only specify fields for a table for which you selected Specified in the Field Selection field of the Audit Tables by Profile (ttaud3120m000) session. If you selected All in that field, all fields in the table are audited, and no fields can be specified.

  • For a detailed explanation of the relation between audit type and field specification, refer to the section How to determine the net result of the audit configuration in the Audit Configuration Management topic.

  • The audit functionality uses the positive approach, which means that you can only specify which tables and fields must be audited, but not which tables and fields must not be audited. Therefore, through the appropriate menu, commands are available to load all (key) fields. You can then delete the fields you do not require.

Categories