Baan/LN Tip of the Week: ERP Setup - Pros & Cons

Kathy Barthelt 0 85029 Article rating: No rating

Pros
Each legal entity can have its own general ledger and balance sheet.
Income statements can be generated for the different logistics companies.
Accounting user must go in and out of companies if there is a need to view or create transactions in more than one company.  However, if all companies are tied to the same financial group company, centralized payments, cash receipt application, and display and printing of ledger transactions and trial balances are possible for both companies from within the financial group company.

Cons

BPCS/LX Tip of the Week: Understanding What Goes On Out On The Factory Floor – Part 4

Anthony Etzel 0 59271 Article rating: No rating

Understanding: What Was Issued to the Shop Order

The shop order inquiry program provides several function keys. By using the function key for the material, the display will present what components have been issued under the issued quantity column. You are also presented with the required quantity. While viewing the quantities you may see that more was issued than what was required. Possibly there was scrap and more material was required to be issued. Perhaps there was an over issue and the balance of the material is slated to be returned to stock.

A red flag should go up if the Shop Order quantity finished is equal to the required quantity for the end item and all the components have not been issued. You may want to investigate why.

BPCS/LX Tip of the Week: Getting the Most Out of the Shop Order Inquiry Program – Part 3

Anthony Etzel 0 56887 Article rating: No rating

Understanding: The quantities required, finished and remaining at the operation and in total for the Shop Order

The shop order may require 1,000 pieces but only 950 are reported as finished in total for the shop order. The quantity required is what is planned on the SO and it may be a higher number than what is finished, factoring in that there can be scrap. If a 1,000 pieces are required to be produced, and there is always is scrap of 10 pieces, then plan for scheduling a quantity of 1,010.

The quantity finished for the end item is what is reported in the inventory application with a production order receipt transaction. At the operation level, if the quantity is reported at the operation, there will be a value in the PCS Complete field on the operation detail screen showing the pieces completed through that operation.

If you want to get a handle on the difference between the required quantity and the finished quantity, you may want to look into reporting quantities at the operation level as well as examining how scrap is controlled and reported.

Baan/LN Tip of the Week: ERP Setup - Pros & Cons

Kathy Barthelt 0 76707 Article rating: 5.0

Pros/Cons of Multi Finance / Single Logistic Company Set-Up


Pros
Each legal entity can have its own general ledger and balance sheet.
Income statements can be generated for the different enterprise units included in the logistics company.
Centralized operations – purchasing, sales, manufacturing, planning, warehousing, etc.
Logistics data visible to all logistics users – a pro if this is what is desired.
One BOM, Routing, and Cost for each item.

 

BPCS/LX Tip of the Week: Getting the Most Out of the Shop Order Inquiry Program – Part 2

Anthony Etzel 0 64223 Article rating: No rating

Understanding: How many hours remain in total and at each operation?

Now let’s look at what information is being supplied from the shop floor.

It’s not uncommon for transaction reporting to be captured manually on the shop packet that was issued to the factory floor when the SO was released.

The big question is, is anything done with the data? Is it collected and keyed to a  spreadsheet and not shared, or is the transaction data keyed to SFC600? If it is being keyed, ask how often and by whom? Some companies use alternative methods to capture transaction data that do not require batch keying via a keyboard.

Not a lot of data is required to be keyed to SFC600 in order for the SO Inquiry to be useful. The data that should be reported for the transaction process is as follows:

  • The type of hours being reported – machine, run labor, setup labor
  • If reporting setup and run labor you want an employee clock number
  • The shop order and the operation that is being reported
  • Is the operation complete
  • How many good were produced at this operation
  • How many hours – the numbers of hours are critical. Do the employees estimate how many hours they worked, or do they track actual time started and stopped in order to calculate the actual number of hours.

Based on what is captured and how often will have an impact on the SO inquiry screen. Understanding the batch times as to when the transactions are keyed will provide you with the window as to the SO status at that point in time. Or, are they keyed as they happen in a near real time fashion so that you can have a more current view of the factory floor.

Baan/LN Tip of the Week: ERP Setup - Pros & Cons

Kathy Barthelt 0 51921 Article rating: No rating

You may have started your setup of your ERP system one way, and have discovered over time that maybe it no longer fits how you need to do business. Here are some pros/cons to consider for a Single Finance / Multi-Logistic setup. 

 Pros
All accounting functions are centralized into one company.  One balance sheet is generated – even though multiple logistics sites are involved.  Income statements can be generated by logistic company via use of a Dimension to represent the logistic company.

Allows logistical functions to be decentralized within one legal entity – if this is what is desired.

Logistics data not visible across companies – pro if you do not want users to see other company’s data.

 

Cons

Crossroads RMC Maintains Preferred Partner Status With Honeywell / Intermec for 2016

Crossroads RMC 0 33000 Article rating: No rating

Honeywell has renewed Crossroads RMC’s Silver Level status in their Performance Partner Program for 2016. This recognition provides Crossroads RMC with the authorization to resell Honeywell/Intermec mobile computing products at a substantial discount, thereby allowing Crossroads’ customers to take advantage of that discount as well. 

Crossroads works closely with the Honeywell /Intermec engineering group to provide the best hardware offerings at a good price point for manufacturers across North America.

BPCS/LX Tip of the Week: Getting the Most Out of the Shop Order Inquiry Program – Part 1

Anthony Etzel 0 61752 Article rating: 5.0

Understanding: How many hours remain in total and at each operation?

First let’s look at some key BPCS Master File data starting with the routing file.

How many routing steps (operations) are set up that reflect how the product is produced in the factory? If you take a short cut and set up only one operation for the entire process, then you will limit the information seen on the SO inquiry program. Set up the operation steps to reflect what you want to report back to from the factory floor.

Will each of the routing steps run in one work center, or in different work centers? To keep it simple you may want to set up work centers as departments. For example:

  • Assembly
  • Machine
  • Paint
  • Etc.

For each operation setup consider how you have set up the following:

  • Load Codes – for example a code 5 is used if reporting both setup time and run labor time. These codes are maintained in the work center file
  • Basis Code – typical codes are P for pieces per hour,  3 is used for hours per 1,000 pieces
  • Setup hours – if you set them up, you also want to report them
  • Run hours – Direct Labor
  • Machine hours

How you set up th

First106107108109111113114115Last

Tips:  LX | BPCS | M3

David Dickson

If ERP is plumbing for the Enterprise - How do we unplug it and keep it from making a huge mess?

I have been working with ERP in various roles for over 30 years, directly involved in over a hundred implementations, while my company has been involved with over 300 more. Of course, in many ways the systems we use today are completely different from what we used in the ‘80s – back then it was green screens, simple transaction entry forms, and cumbersome updates (at best) to link what one department did with all the other areas that needed access to that information. Then there were those planning programs that took all the information along with various parameters the users needed to set and told us what to do.

The More Things Change, the More They Stay the Same

What has surely changed is how we use these systems. Back when I started we used them because we could process more transactions more accurately and faster with a computer, than with the otherwise necessary roomful of clerks. Those clerks, schedulers, and various other clerical employees were the first generation of jobs computers rendered obsolete. Strangely, I do not remember anyone bemoaning those lost jobs. I will let others speculate on the reasons for that.

Individual companies could and did debate the decision about how much they automated. Yes, in retrospect, it is pretty clear that choosing not to automate was to accept a long, slow death for the business, but it is not that long ago when there were still lots of manufacturing managers and business owners who did not use, or like, computers.

Competition Changes Everything

Today a business system is just another piece of necessary infrastructures like an office, a phone, a lawyer, a bank account, and an accountant. The system remains the transaction processing backbone for the organization, but the way in which we use the information that flows from those transactions has changed drastically in this interconnected world. Back in the heady days when ERP was new, the focus was all internal, inside the four walls. Today that seems quaint – the Internet connects all systems and much of the unique incremental benefits (or competitive advantage, if you prefer) come from two deceptively simple concepts – how you connect with the rest of the world from your business systems, and how you monitor your business’s performance in real-time and adapt to what you learn.

I still remember a kickoff meeting twenty years ago for what was then a pretty large ERP implementation at an automotive supplier. Two comments struck me – the first was public. “I like to think of our business as a boat, and we have been steering it by looking out the back. This project will at least let us see out the sides.” The other was in a private meeting when we were discussing change management, and how they would deal with the resistance that would surely come. This same manager said simply, “I guess we will have to fire someone for it, and then the rest will get religion.”

Not terribly ambitious goals, but I give him credit for honesty.

Things have certainly changed a lot in terms of our expectations for the systems, and our approach to implementation, but despite these systems have become an integral and necessary part of the infrastructure of every business, they remain infuriatingly complex and the benefits we expect are often difficult to achieve.

Illusive Benefits = Bad Form

That should not be the case. My goal is to be your guide and share my insights and other good ideas, found across the web, as to how to make business system selection easier and how to get the most benefit from those systems. Because in spite of all the marketing folderol, it seems pretty clear that your friendly software vendor and expert implementation consultants are not going to do that for you. Not because they are stupid or evil people, of course, quite the contrary. They just cannot and will not make the decisions for us that need to be made.

Systems should work for us. Choosing and implementing a system should not be a high-risk proposition for a business, or the individuals doing the work.

The common elements made simple, efficient, and effortless with returns.

My entire career has been dedicated to those goals.

What do you consider yourself to be?

  • internal expert?
  • someone beginning the search and implementation process?
  • an executive looking for a competitive advantage?
  • an industry insider?
  • or someone who finds this amusing for some reason?

All of the above? There is a better way to choose and use software and as someone who could fit into any and all of the categories listed (yes, I really do find business software entertaining in some weird way), I have some ideas I’d love to share with you, so feel free to ask questions.

About the author:

David Dickson is an itinerant generalist; his path to partner and CFO of Crossroads RMC has had its twists and turns. His first twist occurred when an employer needed a business system and picked him because he had three semesters of computer programming in engineering school -- an “expert” born. Somewhere along the line he helped to build and sell a company, which he bought back a couple of years later. Add in another acquisition, a merger, and about 30 years in manufacturing systems in various roles, and you might get a sense from where his real expertise might arise.

Print
37046 Rate this article:
5.0

Contact

David Dickson

David DicksonDavid Dickson

Other posts by David Dickson

Contact author

x

Tips: LN | Baan

Companies can decide to involve a subcontractor and subcontract part of their activities. The subcontractor carries out the work and returns the products to your company.

In Infor LN, subcontracting is considered as purchasing labor from a third party. Therefore, if a manufacturer wants to subcontract work, he must generate a purchase order to start the subcontracting process. These are the types of subcontracting:

  • Subcontracting with material flow
    • Operation subcontracting: For operation subcontracting, a part of the production process (one or more operations) is subcontracted.
    • Item subcontracting: For item subcontracting, an item's entire production process is subcontracted. Therefore, it is always used with material flow support.
  • Subcontracting without material flow: The simplest form of subcontracting is to generate a subcontracting purchase order to record the operations outsourced to a subcontractor. The subcontracting purchase order only represents the administrative handling of the subcontracting process. When the subcontracted item is received back from the subcontractor, you must close the subcontracting purchase order, which initiates the production process.
  • Unplanned subcontracting: Unplanned subcontracting is applicable when you subcontract after generating a production order. For unplanned subcontracting, a purchase order is generated from the production order and the material supply lines are populated by Shop Floor Control.
  • Service subcontracting: For service subcontracting, work on an item to be maintained or repaired is subcontracted. This work entails the entire repair process, or only a part of it. Service subcontracting can be used with or without material flow support.

To start the subcontracting process, a purchase order is required.