Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

End of Year E R P Checklist: Streamline Your Transition to the New Year

Crossroads RMC 0 7203 Article rating: 5.0

The end of the year is a busy time for everyone, but a little preparation can make the start of the next year smoother and more productive. Here's a checklist broken out by the department to help optimize your ERP system as you wrap up this year.

  1. All Departments Checklist
  2. Technology Checklist
  3. Operations Checklist
  4. Finance Checklist

Infor LN & Baan Tips & Tricks: Action Required - Infor LN Cloud Edition - Fonts Update!

Kathy Barthelt 0 62118 Article rating: 5.0

In April 2025, Infor LN Cloud Edition release 2025.04 will introduce the deprecation of Windows® fonts in LN report design and output. This means that Windows fonts will need to be replaced by Google fonts.

Actions Required:

  • All LN Cloud Edition customers must identify all reports modified with the LN report designer and update them by replacing the Windows fonts with Google fonts.
  • Completed before the 2025.04 Maintenance Window.
  • Please see Knowledge Base (KB) article 3523663 for more information, details and FAQs.

Infor LN & Baan Tips & Tricks for TECHNOLOGY: Archiving Data from tipcs300 and ticst300 Tables

Kathy Barthelt 0 61168 Article rating: 5.0

1. Archiving tipcs300

  • Using Session tipcs2260m000:
    • When archiving PCS projects, selecting the "Archive Financial data" option ensures that:
      • Records in tipcs300 are archived to the archiving company.
      • Records are deleted from the original company.
    • If records remain in tipcs300:
      • They may belong to projects that have not been archived.
      • The project may have been archived without selecting "Archive Financial data."
    • Verify there are no errors during the archiving process.
  • Using Session tipcs3500m001:
    • The session "Delete Financial Transactions by Project" can delete records from tipcs300.
    • Note: This session is not for archiving; it removes records without copying them to the archiving company.

2. Archiving ticst300

  • Using Session ticst0250m000:
    • The session "Archive Production Orders" allows:
      • Archiving and deleting records from the original company.
      • Only deleting records from the original company.
    • When executed:
      • Records in ticst300 associated with archived orders are removed.
      • Remaining records belong to unarchived orders.

Infor LN & Baan Tips & Tricks for OPERATIONS: What is Statistical Inventory Control (SIC) and How Does It Work?

Kathy Barthelt 0 54745 Article rating: 5.0

Statistical Inventory Control (SIC) is an inventory-controlled order system designed to maintain stock levels based on predefined thresholds, rather than being demand-driven like EP (Enterprise Planning). Since SIC relies on inventory levels, it may lead to higher stock levels. To minimize financial risks, SIC is best suited for:

  • Low-cost items.
  • Items with predictable demand or short lead times.


Applications of SIC

  • Low-Cost Items: Particularly effective for inexpensive goods.
  • Predictable Demand or Short Lead Time: Suitable when demand patterns are stable or lead times are minimal.
  • Warehouse-Specific Planning: Useful for planning by warehouse rather than across the supply chain.
  • Trading Industries: Commonly employed in sectors like supermarkets.
  • Immediate Demands: Effective for items required immediately by customers.
  • Ease of Use: Simple to implement and manage.


Limitations of SIC

First567810121314Last

Tips:  LX | BPCS | M3

Tips: LN | Baan

Kathy Barthelt

Introducing VJES (Visual Job Execution Software)

You would be hard-pressed to completely miss the stories in the news recently about quality issues in manufacturing. The crux of the issue has been a complete focus on production and a lack of focus on quality. Yes, it is a wonderful thing to get the goods out the door, but when you’re sacrificing quality, what good is it really?

There are specifications for production for a reason. Engineering exists for a reason. If products are not built according to exact design specifications, scrap is likely to go up, rework goes up, customer returns and/or service requests go up, and customer satisfaction and overall customer confidence in your product plummets.

Is all of that worth it to get the good out the door in the shortest amount of time possible?

Every manufacturer relies on a few core measurements to manage their operations. Measurements like efficiency, productivity, capacity, labor and equipment utilization are used by manufacturers across the globe to benchmark performance and assess the effectiveness of processes.

Quality needs to be part of that mix. Because measurements like efficiency and productivity don’t necessarily mean high quality, incorporating ways to ensure quality from the start can help to eliminate waste and rework.

Manufacturing quality is achieved through quality control using documented, repeatable, and measurable processes.

What if you could incorporate quality control in every operation, at every work center to not only ensure high-quality finished goods but also simultaneously train high-quality operators?

Introducing Crossroads’ ERP independent solution, VJES (Visual Job Execution Software). VJES is an electronic work instruction interface between engineering and the paperless manufacturing floor. VJES makes available only one version of the work instructions – the RIGHT one. By deploying up-to-date, visually rich work instructions, images, and videos, VJES gives production personnel the best opportunity to build it right the first time and provides a way to track worker productivity during the build at every step.

VJES Overview

VJES achieves RESULTS:

  • Turn new hire welders into specialized welders in 2 weeks
  • Improvement of quality score from 68/100 to 93/100 in 12 months
  • During the first month of use, employee training timeframe improved from 1 week, to 3 days.
  • First pass yield percentage at 100% for 8 months straight this year.
  • Able to incorporate a quality cell after productivity increased due to newfound bandwidth received when adopting VJES.


Request a demo or Contact us to learn more.

Print
18721 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

x

Categories