Infor LX & BPCS Tip: LX 8.4 – Manufacturing Field Size Expansions

This enhancement provides expanded field sizes for many key manufacturing data elements. This expansion impacts panels, reports, work fields, as well as parameters and other technical areas.

The benefits of the expanded field enhancement include: 

  • Support for companies that have global operations in a single database.
  • Improved data accuracy due to additional decimal points.
  • Improved data accuracy due to additional capacity for totals and summaries.
  • Provides more definitions of additional values, including more meaningful values due to fewer abbreviations.
  • Provides a greater number of days for data retention.
  • Meets regulatory requirements or industry standards.
  • Avoids re-use or duplication of keys.

The programs or areas impacted include:

  • Shop Order Number (9N)
  • Summary Quantity fields (13,3)
  • DWM Summary Weight fields (13,4)
  • Transaction History Sequence (16N)
  • Instrument Serial Number (50A)
  • Item Class (5A)
  • Item Discount Code (5A)
  • Shop Order Priority Code (2N)
  • Catalog String (512A)
  • Comment (35A on ECM TITB file)
Previous Article Infor LN & Baan Tip of the Week: LN 10.7 - Inventory Check for Sales Orders
Next Article Infor LN & Baan Tip: Open Transactions Check – LN 10.7
Print
17996 Rate this article:
5.0

Contact

George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Tips: LN | Baan

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.