Infor LX & BPCS Tip: LX 8.4 – Manufacturing Field Size Expansions

This enhancement provides expanded field sizes for many key manufacturing data elements. This expansion impacts panels, reports, work fields, as well as parameters and other technical areas.

The benefits of the expanded field enhancement include: 

  • Support for companies that have global operations in a single database.
  • Improved data accuracy due to additional decimal points.
  • Improved data accuracy due to additional capacity for totals and summaries.
  • Provides more definitions of additional values, including more meaningful values due to fewer abbreviations.
  • Provides a greater number of days for data retention.
  • Meets regulatory requirements or industry standards.
  • Avoids re-use or duplication of keys.

The programs or areas impacted include:

  • Shop Order Number (9N)
  • Summary Quantity fields (13,3)
  • DWM Summary Weight fields (13,4)
  • Transaction History Sequence (16N)
  • Instrument Serial Number (50A)
  • Item Class (5A)
  • Item Discount Code (5A)
  • Shop Order Priority Code (2N)
  • Catalog String (512A)
  • Comment (35A on ECM TITB file)
Previous Article Infor LN & Baan Tip of the Week: LN 10.7 - Inventory Check for Sales Orders
Next Article Infor LN & Baan Tip: Open Transactions Check – LN 10.7
Print
15371 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

Ok… so you want to know the status of a specific shop order that was released two days ago.

What do you do?

It’s a sure bet that you have a manager, supervisor, or planner who can walk the floor and find the order at whatever work center it happens to be at. He/she can then answer “what operations have been completed and how many were completed?” All this requires leg work, and of course, a fair amount of time.

Now, if you have set up your BPCS master files properly, and you report transaction activity, you should be able to get those shop order statuses much faster using the SFC300 Shop Order Inquiry Screen.

At your fingertips you can see:

  • Release date & due date
  • How many hours remain in total and at each operation
  • The quantity required, what was finished, and the remaining quantity
  • What components (materials) have been issued

Pretty basic information, right? Are you getting what you need to know? If not, then you may want to reexamine how your BPCS files are set up and what transactions along with their frequency are captured.