Baan/LN Tip: New Mapping Scheme

After a new mapping scheme is copied from an existing one, it is possible to check transactions in a simulation mode, before activating the new scheme. However, before the simulation can take place, the new mapping scheme needs to have completed the “Check Mapping Scheme” step. When the check is completed, a transaction can be simulated by highlighting it and from the Specific menu, selecting “Map with Specific Mapping Scheme.” Any errors can be corrected without having to activate the new mapping scheme.
Previous Article Anthony Etzel- Featured Speaker at inPower 2019
Next Article Baan & LN Integration News: Playing Telephone Can Get You In Trouble
Print
81410 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

Ok… so you want to know the status of a specific shop order that was released two days ago.

What do you do?

It’s a sure bet that you have a manager, supervisor, or planner who can walk the floor and find the order at whatever work center it happens to be at. He/she can then answer “what operations have been completed and how many were completed?” All this requires leg work, and of course, a fair amount of time.

Now, if you have set up your BPCS master files properly, and you report transaction activity, you should be able to get those shop order statuses much faster using the SFC300 Shop Order Inquiry Screen.

At your fingertips you can see:

  • Release date & due date
  • How many hours remain in total and at each operation
  • The quantity required, what was finished, and the remaining quantity
  • What components (materials) have been issued

Pretty basic information, right? Are you getting what you need to know? If not, then you may want to reexamine how your BPCS files are set up and what transactions along with their frequency are captured.