Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Event / News

Crenlo Partners With Crossroads RMC to Achieve Operational Efficiency

Crenlo, a leading manufacturer of cab and enclosure products, has elected to expand their partnership with Crossroads RMC to achieve greater efficiency within their operations. Phase 1 of the implementation will include RMCship (FedEx/UPS integration with Baan), RMCbuild (analysis of current inventory for production needs), Paperless Pick Web Collect Data Collection for their service orders and remote warehouse, and the development of a web-based quality inspection application which will be integrated with their Baan ERP system. 

Previous Article BPCS/LX Tip of the Week: Tip of the Week: Cross Docking
Next Article Baan/LN Tip of the Week: 6 Powerful Steps to Win With Automation
Print
30306 Rate this article:
No rating
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

These programs are used to capture and post shop floor information. Labor reporting, machine time, etc. can be captured by either program. The key difference is that one will also capture the production receipt and backflush components. Based on your company information / transaction process, one of these programs will most likely be used daily to capture current shop floor data. You can use the shop packet labor ticket for the manual recording, and the keying of the data. Alternatively, you can incorporate an automated method like an MES solution to capture the data and streamline the process.

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

FirstLast

Tips: LN | Baan

Categories