Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC
/ Categories: Event / News

Pushing Forward In the Face of Adversity. Soundview recently suffered a major loss when fire struck on January 30, 2019.

Soundview Paper lost their main building when disaster struck. This building housed offices, their computer center and part of their manufacturing facility. The loss including hardware, networks, system data backups, etc. Crossroads RMC was contacted immediately to assist in the recovery of their BPCS V6 system. With limited backups and a full team effort, Crossroads RMC assisted in the acquisition of new hardware and are currently in the midst of helping to bring their system back to life. Soundview has secured support from various partners to make all this happen, and we are privileged to be part of the team. A lot of work has been done so far, but we have a long road ahead. Users will soon regain access by the end of this week,  and as required, Crossroads RMC will provide the necessary consulting support from our LX team to get Soundview back up and running. We are communicating with them daily, as we work thru this process.

Previous Article BPCS/LX Tip of the Week: Facility Period Close
Next Article Anthony Etzel- Featured Speaker at inPower 2019
Print
22344 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

These programs are used to capture and post shop floor information. Labor reporting, machine time, etc. can be captured by either program. The key difference is that one will also capture the production receipt and backflush components. Based on your company information / transaction process, one of these programs will most likely be used daily to capture current shop floor data. You can use the shop packet labor ticket for the manual recording, and the keying of the data. Alternatively, you can incorporate an automated method like an MES solution to capture the data and streamline the process.

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

FirstLast

Tips: LN | Baan

Categories