Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC

Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3

AND Infor will no longer support LX and related products on IBM i 7.3 as of June 1, 2024

THE CLOCK is T I C K I N G ... 

MARK YOUR CALENDARS!
Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3  AND  in line with IBM’s support policy, Infor will no longer support LX and related products on IBM i 7.3 after May 31, 2024.

All Infor LX releases, patches, and related solutions will be delivered and compiled at IBM i 7.4, effective June 1, 2024. 
These deliverables will install and function on version 7 release 4 (IBM i 7.4) and above (IBM announced in May 2023 the release of V7R5M0).
NOTE: This will require your operating system to be at a minimum release level of IBM i 7.4.

This policy extends to other Infor LX-related technologies including:

  • WebTop
  • System iWorkspace (SiW)
  • Infor Development Framework (IDF)


ACTION  STEPS

We recommend you start planning your upgrade to IBM i 7.4 (*or above) to allow ample time for testing and completion prior to June 1, 2024. It is strongly recommended that you keep current to avoid these extra fees.
*Special NOTE:  All versions of LX 8.3.4 and below will see an annual 20% Extended Maintenance Fee.

Please reach out to Crossroads RMC to assist you in this planning and execution process. We have assisted many other clients with both IBM OS and Infor ERPLX software upgrades. 

800.762.2077 |  solutions@crossroadsrmc.com

Previous Article Infor LN & Baan Tip: Considerations for Release to Warehousing for a Cost Item
Next Article ERP & the Importance of Accuracy & Productivity
Print
13858 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

These programs are used to capture and post shop floor information. Labor reporting, machine time, etc. can be captured by either program. The key difference is that one will also capture the production receipt and backflush components. Based on your company information / transaction process, one of these programs will most likely be used daily to capture current shop floor data. You can use the shop packet labor ticket for the manual recording, and the keying of the data. Alternatively, you can incorporate an automated method like an MES solution to capture the data and streamline the process.

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

FirstLast

Tips: LN | Baan

Categories