The Best Baan | Infor LN Manufacturing Reports to Analyze Company Performance

You know what ERP data you need to analyze your company’s production health, but sometimes it is a struggle to get that data in a format that is meaningful. Here are some reports in Baan & Infor LN which you may find useful.

As is the case with most ERP reports, with each version progression from the earliest versions of Baan to the latest version of Infor LN, there are improvements in selection criteria and report content. Some may require some setup and others may require some formatting if you would like to export them to Excel. Contact me if you have questions or need assistance.

BAAN & LN MANUFACTURING:

Baan IV

  • Print Actual Cost by Production Order ticst0401m000
    • This report can be run at any time in the production order’s life to show how hours-spent and material-used compare between estimated and actual usage.
       
  • Print Work Center Utilization By Week tiscf1402m000
    • This report shows capacity issues at work centers/machines which help identify production bottlenecks.


Baan V

  • Print Estimated vs Actual Material Costs ticst0401m000
    • This report can be run at any time in the production order’s life to show how actual material-used compares to estimated usage.
       
  • Print Estimated vs Actual Hour Costs ticst0402m000
    • This report can be run at any time in the production order’s life to show how actual hours-spent compares estimated hours.
       
  • Print Work Center Utilization By Week tiscf1402m000
    • This report shows capacity issues at work centers/machines which help identify production bottlenecks.


Infor LN

  • Print Estimated vs Actual Material Costs ticst0401m000
    • This report can be run at any time in the production order’s life to show how actual material-used compares to estimated usage.
       
  • Print Estimated vs Actual Hour Costs ticst0402m000
    • This report can be run at any time in the production order’s life to show how actual hours-spent compares estimated hours.
       
  • Utilization report from– Print Resource Order Plan cprrp0430m000
    • This report from Enterprise Planning will show all orders from planning and production. By incorporating both order types, capacity issues can be seen short range where planning has determined that new orders are needed, as well as long range where planners may find opportunities to shift work or even to plan machine maintenance.

Previous Article The Best BPCS | Infor LX Manufacturing Reports to Analyze Company Performance
Next Article Infor LX & BPCS Tip of the Week: Reports to Analyze Company Performance
Print
64618 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

These programs are used to capture and post shop floor information. Labor reporting, machine time, etc. can be captured by either program. The key difference is that one will also capture the production receipt and backflush components. Based on your company information / transaction process, one of these programs will most likely be used daily to capture current shop floor data. You can use the shop packet labor ticket for the manual recording, and the keying of the data. Alternatively, you can incorporate an automated method like an MES solution to capture the data and streamline the process.

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.