Infor LX & BPCS Tip of the Week: Installing WebTop Over LX

If you plan to use Infor WebTop, the WebTop version 4.7 or above is required when running LX 8.4. Also, acquire and install the latest WebTop 4.7 patches from Infor Xtreme prior to running LX WebTop. WebTop 4.7 can be applied to your existing environments before you install 8.4.0. If this is completed before installing LX 8.4 then the LX install will take care of much of the Webtop server configuration automatically, including installing the LX Webtop metadata, updating WEB_ENV, and including the Webtop Platform library in the INLIBL data area as part of the environment setup. If you choose to install WebTop after the LX 8.4 installation is completed, the “Infor LX 8.4 Webtop 4.7 Configuration Guide” will guide you through all the configuration steps to set up Webtop for your LX environment.

Previous Article LN & Baan Data Collection News – A BUSY 2nd Quarter for Crossroads RMC Data Collection!
Next Article Infor LN & Baan Tip of the Week: What is Included with Infor Operating Service (Infor OS)?
Print
34345 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The LMP module (Lean Manufacturing Process) uses work centers but refers to them as production cells.

A cell is one or more work centers that produces an end item. So when a company decides to adopt the lean manufacturing philosophy, the concept of work centers takes on a new meaning.

In lean terms, the work center, or group of work centers, becomes a production cell. In other words, a mini-factory producing end items with similar characteristics.

In the master schedule creation, you have the flexibility to enter a planning start date, or default to the facility planning start date. Infor LX uses the planning date to plan both orders with forecasts and customer orders as demand.You can create your master schedule from the Master Production Scheduling module (MPS).