Baan/LN Tip of the Week: 6 Powerful Steps to Win With Automation

1. Eliminate paper shop packet and distribution of the paperwork to the shop floor.     

2. Eliminate manual (paper-based) recording activities and the need to key in the transactions.

3. Easy electronic scheduling by sequence and changing job priorities.

4. Evaluate differences using actual times compared to standards.

5. Improve data accuracy and eliminate the need to chase and fix errors.

6. Practice Real-Time data reporting to monitor efficiencies and identify problems as they occur.

Previous Article BPCS/LX Tip of the Week: Receiving to Inspection
Next Article BPCS/LX Tip of the Week: 6 powerful steps to win with automation
Print
84332 Rate this article:
No rating
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In Infor LX, based on how your items are set up and on how you structure the Bill of Material, the following are some usages of a bill of material by functioning area:

  • Engineering & QA – change control, product design and specifications
  • Manufacturing – build instructions , material pick lists
  • Accounting – product costing
  • Materials Inventory – material and inventory planning
  • Sales – customer order processing
  • Production Scheduling – item scheduling (also a component of an MES solution)
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.