Kathy Barthelt

Clack Corporation Goes Live on LN 10.4

Clack Corporation, a leader in water treatment and plastic processing, has gone live with Infor LN 10.4. The Crossroads RMC team partnered with Clack in this very important technology initiative for the company. With Clack’s dominance in the industry, they were challenged to provide a top-notch ERP system that would keep up with their ever-expanding business needs. LN 10.4 provides the right tools, specifically geared towards industrial manufacturers such as Clack. Combined with the Crossroads RMC Shop Floor Data Collection Solution for LN, Clack is positioned very well for growth in the years ahead.

Previous Article BPCS/LX Tip of the Week: Financial Year End – Have you done all you need to do?
Next Article Top 3 Baan/LN Tips of 2016
Print
26255 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In Infor LX, based on how your items are set up and on how you structure the Bill of Material, the following are some usages of a bill of material by functioning area:

  • Engineering & QA – change control, product design and specifications
  • Manufacturing – build instructions , material pick lists
  • Accounting – product costing
  • Materials Inventory – material and inventory planning
  • Sales – customer order processing
  • Production Scheduling – item scheduling (also a component of an MES solution)
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.