Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses
/ Categories: Infor LX & BPCS Tips

Infor LX & BPCS Tip of the Week: Order processing enhancement – LX 8.4

Restrict Over-shipments to Customers

  • System parameter option controls when over shipments are allowed

Options to:

  • Continue current process with warning message
  • Give error message
  • Automatically correct to quantity available for shipment
     
  • Option to revise the order quantity so that pricing, promotions, credit checking load planning and other processes reflect the actual quantity
  • Allows better control of exceptions for over shipments
  • Ensures that pricing, promotions are correctly based on actual order quantity
Previous Article About 65% of the world’s population are visual learners. This extends into the ERP software realm, too.
Next Article Consulting News: How comprehensive is the Crossroads RMC ERP business audit & how does it work?
Print
62905 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In Infor LX, based on how your items are set up and on how you structure the Bill of Material, the following are some usages of a bill of material by functioning area:

  • Engineering & QA – change control, product design and specifications
  • Manufacturing – build instructions , material pick lists
  • Accounting – product costing
  • Materials Inventory – material and inventory planning
  • Sales – customer order processing
  • Production Scheduling – item scheduling (also a component of an MES solution)
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.
FirstLast

Tips: LN | Baan

Categories