Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Warehouse Material Movement / Problems With the Inventory Structure Table (whinr150)

This has come up as an issue during various stages of warehouse material movements – transfers, outbounds, shipments. We have seen it right up to 10.4. The inventory structure table (whinr150) becomes a problem. The error points to that table, but users are lost as to how to fix it.

In the session Units by Unit Set many companies let the field Storage default to Yes. If the UOM is not intended to be used in inventory then that setting should be No. 

If an item is purchased in UOM different from the inventory unit and the setting is Yes then LN adds a record in that UOM to the inventory structure table. It is that record that causes problem later.

The session has an option to change the value of the storage field. Specific > Convert Use for Storage. This option works both ways and will correct all inventory in the UOM range. 

Should a user receive an error that references inventory structure table then the solution is to check that session to see if an odd UOM exists in it. If so use the Convert Use for Storage to correct the problem.

Previous Article Baan/LN Tip: Disabling Unused Functionality in LN
Next Article Crossroads is proud to work with Johnson Crushers International on their LN re-implementation to 10.6
Print
76368 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In Infor LX, based on how your items are set up and on how you structure the Bill of Material, the following are some usages of a bill of material by functioning area:

  • Engineering & QA – change control, product design and specifications
  • Manufacturing – build instructions , material pick lists
  • Accounting – product costing
  • Materials Inventory – material and inventory planning
  • Sales – customer order processing
  • Production Scheduling – item scheduling (also a component of an MES solution)
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.
FirstLast

Tips: LN | Baan

In typical LN REST API integrations, permissions and authorizations are not implemented or rarely used. To ensure smooth data exchange and avoid errors, it is recommended to disable the authorization and security settings.

Recommendation:

  • In the Authorization and Security Parameters session (tcsec0100m000):

    • Clear the Authorization and Security Enabled check box.

    • Clear all check boxes under Authorization Enable for on the Enabling tab.

Why This Matters:

  • Enabling authorization and security without proper setup can lead to errors and blocked transactions during integration.

  • For example, work center permissions may interfere with:

    • Creating new shifts

    • Booking machine hours

    • Read more

Categories