Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC
/ Categories: Event / News

Don’t Let Malware Destroy Your ERP System!

We just got a report that another one of our customers has been affected by malware. In this case it wiped out their ERP server. We are working with them to restore it an get everything up and running again. It is highly likely that this got into their network by an email attachment. This seemed like a good opportunity to remind everyone to be extremely careful with email attachments. Even if it appears to be from someone that you know, email “From” addresses can be forged.

Best practice is to save the attachment to a folder, and run a virus scan before opening or viewing the file.

Previous Article Baan/LN Tip: Credit Control Parameters (ACR Parameters)
Next Article Navistar goes global with Crossroads RMC!
Print
23575 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In Infor LX, based on how your items are set up and on how you structure the Bill of Material, the following are some usages of a bill of material by functioning area:

  • Engineering & QA – change control, product design and specifications
  • Manufacturing – build instructions , material pick lists
  • Accounting – product costing
  • Materials Inventory – material and inventory planning
  • Sales – customer order processing
  • Production Scheduling – item scheduling (also a component of an MES solution)
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.
FirstLast

Tips: LN | Baan

Categories