Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LN & Baan Tip of the Week: Wrap Toolbar Option
Kathy Barthelt

Infor LN & Baan Tip of the Week: Wrap Toolbar Option

The Wrap Toolbar option has been added. You can use this option to wrap toolbar buttons to the next line if it becomes too narrow to add on the same line. If this option is selected, every session has the option available in the Personalization menu. This gives the user the possibility to change the wrapping state of the toolbar per session. This setting is saved as a personalization. You can configure this option in the Tools Parameters (ttaad0100m000) session and for specific users in the User Data Template (ttams1110m000) session.

Note: LN UI 12.2.6 or later is required.

Previous Article An Infor LX upgrade in a month? Crossroads consultants make it happen!
Next Article LN & Baan Data Collection News – A BUSY 2nd Quarter for Crossroads RMC Data Collection!
Print
75738 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In Infor LX, based on how your items are set up and on how you structure the Bill of Material, the following are some usages of a bill of material by functioning area:

  • Engineering & QA – change control, product design and specifications
  • Manufacturing – build instructions , material pick lists
  • Accounting – product costing
  • Materials Inventory – material and inventory planning
  • Sales – customer order processing
  • Production Scheduling – item scheduling (also a component of an MES solution)
In the Shop Floor Control Module, you have the ability to key in both direct labor and indirect labor. However you want to establish specific types (reasons) for the indirect labor. The SFC600 labor entry program shows a reason code field, but it is designed for reject quantity and machine downtime reasons, not indirect labor reasons.

There is a way around this. With an MES solution you have the ability to setup and report indirect time against a specific reason code.
FirstLast

Tips: LN | Baan

Categories