Infor LX & BPCS Tip: LX 8.4 – Manufacturing Field Size Expansions

This enhancement provides expanded field sizes for many key manufacturing data elements. This expansion impacts panels, reports, work fields, as well as parameters and other technical areas.

The benefits of the expanded field enhancement include: 

  • Support for companies that have global operations in a single database.
  • Improved data accuracy due to additional decimal points.
  • Improved data accuracy due to additional capacity for totals and summaries.
  • Provides more definitions of additional values, including more meaningful values due to fewer abbreviations.
  • Provides a greater number of days for data retention.
  • Meets regulatory requirements or industry standards.
  • Avoids re-use or duplication of keys.

The programs or areas impacted include:

  • Shop Order Number (9N)
  • Summary Quantity fields (13,3)
  • DWM Summary Weight fields (13,4)
  • Transaction History Sequence (16N)
  • Instrument Serial Number (50A)
  • Item Class (5A)
  • Item Discount Code (5A)
  • Shop Order Priority Code (2N)
  • Catalog String (512A)
  • Comment (35A on ECM TITB file)
Previous Article Infor LN & Baan Tip of the Week: LN 10.7 - Inventory Check for Sales Orders
Next Article Infor LN & Baan Tip: Open Transactions Check – LN 10.7
Print
15402 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.

Make to Order? No problem if you use the Configuration Management System. This LX product allows you to define and configure a make to order product during Customer Order Entry. Basically, you have the option to create different products under the same common product item. You will get two completely different common end items that are configured from the same common parent.

The customer orders are planned and turned into shop orders for each end item with all the associated components. With an MES solution in place, the shop order side is easy to schedule and allows you to manage the shop floor.