Learn how MES can benefit your company in 2020 by simply doing all of these things...

Do your users have an easy way to do all of these things? If not, you should learn how MES could benefit your company in 2020!

  • Schedule work from a work center to a specific machine or work area.
  • Re-sequence work and split for better flexibility in scheduling shop floor activities.
  • Receive work schedules electronically as well as interacting with it by reporting transactional activity.
  • Electronically display drawings, process instructions, and quality instructions to eliminate (or minimize) the need for paper on the shop floor.
  • Pass shop floor transactional activity to dashboard displays as well as your ERP system.

Learn more about Crossroads MES>

Previous Article Infor LX & BPCS Tip of the Week: What is EGLi?
Next Article Motivate Your Infor LX & BPCS Team with Dashboards
Print
34327 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.