Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Anthony Etzel

If you can't see everything that happens on your shop floor, you are at a competitive disadvantage

If you’re not able to see everything that happens on your shop floor in real time, you’re at a HUGE competitive disadvantage! Your competitors are running MES. 

Crossroads MES software provides:

  • A user-friendly interface and an easy exchange of information between the shop floor users and your ERP database. 
  • Planners the ability to schedule work to a specific machine or work area. In addition, it allows for work to be re-sequenced and split for better flexibility in scheduling shop floor activities.
  • Factory workers with the ability to receive the work schedule electronically as well as interacting with it by reporting transactional activity.
  • The ability to electronically display Drawing, Process Instructions, and Quality Instructions so you can eliminate, or minimize, the need for some of the paper on the shop floor.
  • The ability to pass shop floor transactional activity to dashboard displays as well as the ERP system. 

Click here to learn more about Crossroads MES 

or Contact Anthony Etzel today to learn more.

Previous Article Infor LN & Baan Tip of the Week: Job Groups in LN
Next Article Crossroads RMC is proud to announce the release of the following dashboard views that come STANDARD with the LX Analytics Dashboard
Print
31183 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

FirstLast

Tips: LN | Baan

Categories