Infor LN & Baan: What are your production orders telling you?

Measure what you want to improve.

Six simple words, but put together they convey a powerful concept that can transform manufacturing companies. It’s a basic concept that’s hard to argue with: Collect data, see where the data leads you, and make changes that have a positive impact on the data. Repeat often.

If your company is manufacturing a product, you’re more than likely creating manufacturing variances. These variances tell managers where the company is not performing to the standards that were created and agreed to by those responsible in the Engineering, Finance, or Production Departments. There is almost a 100% chance you are creating either favorable or unfavorable manufacturing variances and, quite frankly, none of the variances will ever be favorable because the company is either over-costing or under-costing the production parts.

The data is all there within your ERP system… or at least it should be… provided that you are not tracking production information outside of your ERP system in a spreadsheet.

Analyzing your production orders can help you track down:

  • Missing labor entries
  • Incorrect labor standards
  • Incorrect time estimates for routing steps
  • Inaccurate or non-existent material issues
  • Work order structures that are not accurate
  • And more


Crossroads also offers a Production Order Variance Report package for Baan and Infor LN which quickly identifies problems with pricing, materials, efficiency, and rejects. learn more> 

Not sure where to start? Crossroads RMC’s supply chain and manufacturing audit can help identify problem areas in Purchasing, Customer Service, Billing, Inventory, Costing, Bills of Materials and Routings, Material Requirements Planning and Shop Floor Control, and more.

Request a Supply Chain & Manufacturing Audit, or Contact me today to learn more - 800.762.2077

Previous Article Infor LN & Baan Tip: MPS planned vs. MRP planned
Next Article Infor LX & BPCS Finance Tip: Items without costs, CST101D
Print
29457 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.