Infor LX & BPCS Tip of the Week: Installing WebTop Over LX

If you plan to use Infor WebTop, the WebTop version 4.7 or above is required when running LX 8.4. Also, acquire and install the latest WebTop 4.7 patches from Infor Xtreme prior to running LX WebTop. WebTop 4.7 can be applied to your existing environments before you install 8.4.0. If this is completed before installing LX 8.4 then the LX install will take care of much of the Webtop server configuration automatically, including installing the LX Webtop metadata, updating WEB_ENV, and including the Webtop Platform library in the INLIBL data area as part of the environment setup. If you choose to install WebTop after the LX 8.4 installation is completed, the “Infor LX 8.4 Webtop 4.7 Configuration Guide” will guide you through all the configuration steps to set up Webtop for your LX environment.

Previous Article LN & Baan Data Collection News – A BUSY 2nd Quarter for Crossroads RMC Data Collection!
Next Article Infor LN & Baan Tip of the Week: What is Included with Infor Operating Service (Infor OS)?
Print
34402 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system allows you to manipulate and maintain a simulated MPS and MRP. You can copy the simulation from the existing first cut or you can create a totally new schedule. You can also perform a simulation of the rough-cut capacity plan. This allows a quick visual inspection by inquiry or menu of needed work center loads for the proposed MPS. After you choose a suitable MPS and rough-cut capacity, the system allows you to transfer the simulated MPS to the live Master Production Schedule.

The system supports four levels of inventory. You can view summaries of stock at each level through the Material Status Inquiry program or through reports.

 

Below are the four levels:

▪  Item

▪  Item + warehouse

▪  Item + warehouse + location

▪  Item + warehouse + location + lot

 

The lot number level and/or container of inventory can cross multiple warehouses and locations. For example, item + lot or item + lot + container. Locations exist within warehouses. There is no limit on the number of warehouses, locations, or lots that you can assign to an item.