Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses
/ Categories: Infor LX & BPCS Tips

Infor LX & BPCS Tip: What is the purpose of document sequencing? How does it work?

Document Sequencing (ACR160) is a feature that allows the BPCS/LX system to assign a unique document number to every document created through ACP, ACR, and BIL. It is required for use with ATP (the general ledger posting engine) for ACR and BIL and is strongly recommended for use with ACP. Historically, we have experienced seemingly unexplainable events when Document Sequencing is not used and those events get cleared up once it is turned on.

Document Sequencing in ACP does not affect the Vendor Invoicing process for the user. You will still enter the Company, Vendor, and Invoice Number when you create invoices or memos. It provides the system with a better and more unique document number for the invoices so that the system can locate, identify, and link to the correct invoices during the processing of transactions and afterward when trying to trace transactions from ACP to CEA and back.

Document Sequencing is turned on in ACP180 Prefix Specific Numbering by setting it to a ‘1’ to assign the number at invoice entry and logging, or ‘2’ to assign the number at invoice entry and un-logging.

When Document Sequencing is turned on, the Document Sequence setup has to be defined in the system. For ACP, this is done in ACR160B, which is found in the ACP02 Accounts Payable Maintenance Menu (don’t confuse this with ACR160D which is found in the ACR01 menu and is used for ACR and BIL document sequence setup). Document Sequencing is defined by Company and Prefix Code. Blank is a valid Prefix code that can be defined and used, but most customers use a Prefix Code to differentiate certain types of transactions as it gives them a unique way to identify different types of invoices in the system and the prefix can be pulled into a journal entry to help determine account strings, or into reference or analysis field information.

The document sequence can also be set as a perpetual sequence where you will never need to do the roll (ACR920) and will not need to maintain the file in the future. (This is common for most of our clients).

  • Document Sequence Maintenance ACR160, set the End Date for the current year to 99/99/9999 (this is the default when creating a new doc sequence) and leave the next year start and end date at 00/00/0000.
Previous Article Reskilling and Upskilling Your Staff – Why You Shouldn’t Ignore This
Next Article Infor LN & Baan Tip: Considerations for Release to Warehousing for a Cost Item
Print
19982 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Just-in-Time (JIT) is a management philosophy that focuses on minimizing the resources necessary to add value to your products and to operate your factory in ways that eliminate waste. Resources are labor, materials, equipment, space, and time. Waste is anything that does not add value to your products. Moving work-in-process from place to place, stacking and sorting, investing capital in large work-in-process and raw material inventories, inspecting materials at your vendors' sites, and tying up warehouse space with finished goods are all activities that add cost, not value, to your products. 

JIT is a process that reduces lead time. JIT does not replace an MRP, an inventory program, a scheduling technique to bypass your Master Schedule, or a materials management project. JIT is the never-ending commitment of everyone, from top management to your workers on the floor, to maximize your effectiveness through continuous, incremental improvements.

To create and maintain shop orders use SFC500 Shop Order Entry Maintenance. These orders use the standard bill of material (BOM) as the base list of components. You can also set up standard routings, which list the operations,

or work steps, involved in manufacturing.

 

To release shop orders, use the Shop Order Release program, SFC505. Infor ERP LX groups shop orders by user ID for batch processing. Use Shop Packet Print, SFC520, to print the shop orders that you select. SFC530 allows you to create multi-level shop orders to link shop orders together with a common end item parent. Linking multiple shop orders together for a final assembly product provides support for make-to-order and engineer-to-order manufacturing environments which need to schedule these multiple orders together or as a vertical slice in the production schedule.

 

You can make changes to shop orders after you print them. Use Shop Order Entry/Maintenance, SFC500, to update the shop orders. Changes are immediately visible on the inquiry screens for SFC300 and SFC350. To reprint the shop packet, use Reprint Shop Packet, SFC560.

FirstLast

Tips: LN | Baan

Categories