Infor News You Can Use: Discover the Power of Advanced Planning & Scheduling with industry expert Greg Keating

CloudSuite® Industrial APS - Effective Planning & Scheduling

Learn what it is, how it works, and how it can transform your manufacturing operations.

Logo

Presented by

Greg Keating, Senior Solution Consultant, Infor

About this talk

Bring the future into closer focus If you are like most manufacturers today, managing your planning and scheduling resources has become a major challenge. The disrupted supply chain, workforce availability, equipment capacity, sporadic market demand, and changing customer expectations all contribute to the complexities of planning. Having the right resources available is essential for keeping production flowing and ensuring customers receive orders on time. In this session we will focus on Advanced Planning and Scheduling (APS) capabilities within CloudSuite Industrial. Our Infor expert will share: - What APS is, how it varies from traditional Manufacturing Resource Planning and the difference between Planning and Scheduling within CSI. - The basic configuration requirements needed to effectively utilize APS and available-to-promise/capable-to-promise (ATP/CTP) functionality. We'll also look at the key differences between these solutions - Examples of advanced applications that help identify accurate and reliable commitment dates.

Watch now On-Demand >

Infor On-Demand: 67min talk

Previous Article Bring New Life to Your Infor LN & Baan ERP System
Next Article Infor LN & Baan Tips & Tricks for EXECUTIVES:
Print
9901 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.