Infor LN & Baan TECHNOLOGY Tip: Are you running the latest Infor components?

Always good to stay on top of new releases for your various Infor components. Here is a list of knowledge base articles that you can check for the components listed below:

For the last Infor LN, Infor Baan5, and Infor Baan4 porting set see KB 22923520

For the last BaanIVc 6.1c porting set see KB 22923521  No fixes are made based on the 6.1c porting set.

For the last Worktop set see KB 22881488 For the last BW set see KB 22881483 For the last EME set see KB 22866552 For the last Office integration set see KB 22867312 For the last Dynamic Form Editor see KB 22881485

Previous Article Infor LN & Baan FINANCE Tip: Is it possible to upload accounts receivable invoices into LN using Excel?
Next Article Infor LN & Baan OPERATIONS Tip: MPS Planned vs. MRP Planned
Print
23295 Rate this article:
.2
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The system automatically performs offsets for requirements dates for components in the MPS/MRP calculations. It also performs offsets for calculation of material need dates at the time that shop orders are released.

To calculate the offset, the system takes the parent lead time from the Item Master and adjusts it by the bill of materials offset (plus or minus) for the component. This gives the lead time days for that specific component. The system starts with the due date of the parent and backs up and skips all non-workdays in the shop calendar.

Note that the offset calculation uses only calendar records that have a blank work center (the calendar record applies to all work centers). See the information for the Shop Calendar Maintenance program, SFC140, in your Shop Floor Control documentation for shop calendar details.

For either file, you must specify a valid location code as defined in the Location Master File.

If the machine master locations are blank, then the work center locations are used. There are cases where you may want to do a combination between the two in defining the locations.

Let’s say the end item has one operation. The operation is at work center 510 and Machine A is in the work center. You have locations setup in both the Work center file and the Machine master File. You report 100 complete at the work center without specifying the machine.

In this case, the inventory will be processed based on the locations defined in the work center file. If the transaction included the machine number, then the locations in the machine file would be used.