Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Event / News

FSB North America Streamlines Their Shipping on Infor LN with RMCship

FSB North America, a leading producer of high quality electrified and mechanical locking devices, has selected the RMCship solution from Crossroads RMC to streamline their shipping process on Infor LN and the integration with FedEx® and UPS Worldship™. Using Web Collect formerly RMCship for shipping increases accuracy by eliminating manual steps, streamlines operations, and process steps, and improves customer satisfaction.

Previous Article BPCS/LX Tip of the Week: Vendor Evaluation
Next Article Baan/LN Tip of the Week: Setting Up Interest Invoicing
Print
24144 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Is Lot Control necessary?

Certain industries require lot control, where others may find it an option based on how they want to trace the material used in a product in the event of a defect, or recall.

LX provides tight lot controls and flexibility with lot number assignments. Shop orders can have a pre-assigned lot number, or a lot number can be automatically assigned when the item is produced. You can also assign a specific lot number for the entire shop order, or for each item/quantity reported against a shop order.

How can I use an alternate item on a shop order?

The best way is to have the approved alternate item appear on the Bill of Material just after the standard item with a zero required quantity. Now the alternate item will appear on the Shop Order. So, if the standard item is not available, the alternate item can be issued to the shop order.

When the shop order is closed out, one item will have an unfavorable variance while the other shows a favorable variance. This is an easy way to provide alternate items provided engineering approves and they are part of the Bill of Material.

FirstLast

Tips: LN | Baan

Categories