Infor LN & Baan Tip: Why was the session "General Ledger Diagnostics Workbench" built?

Any problem noticed and solved before the period closing will reduce the time and pressure during the actual period close itself. So, the General Ledger Administrator can be assisted in his/her daily tasks by viewing and addressing any issues via the "General Ledger Diagnostics Workbench" (tfgld1590m000) session.

The general ledger administrator needs to complete the following tasks during a given fiscal period:

  • Notice, print, and solve erroneous batches that cannot be finalized
  • Notice and solve integration mapping and posting errors
  • Change GL master data for solving posting errors
  • Make sure external (wages, intergroup) and automatic (recurring) documents are posted into the General Ledger
  • Perform technical utility sessions to correct data (e.g. rebuild history, reverse entry) or reset certain statuses (e.g. batch status).
Previous Article Infor LX & BPCS Tip: How to handle “ZERO COST” items
Next Article Are you ready to maximize the benefits of Infor ERP System?
Print
59549 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Understanding: What Was Issued to the Shop Order

The shop order inquiry program provides several function keys. By using the function key for the material, the display will present what components have been issued under the issued quantity column. You are also presented with the required quantity. While viewing the quantities you may see that more was issued than what was required. Possibly there was scrap and more material was required to be issued. Perhaps there was an over issue and the balance of the material is slated to be returned to stock.

A red flag should go up if the Shop Order quantity finished is equal to the required quantity for the end item and all the components have not been issued. You may want to investigate why.

Understanding: The quantities required, finished and remaining at the operation and in total for the Shop Order

The shop order may require 1,000 pieces but only 950 are reported as finished in total for the shop order. The quantity required is what is planned on the SO and it may be a higher number than what is finished, factoring in that there can be scrap. If a 1,000 pieces are required to be produced, and there is always is scrap of 10 pieces, then plan for scheduling a quantity of 1,010.

The quantity finished for the end item is what is reported in the inventory application with a production order receipt transaction. At the operation level, if the quantity is reported at the operation, there will be a value in the PCS Complete field on the operation detail screen showing the pieces completed through that operation.

If you want to get a handle on the difference between the required quantity and the finished quantity, you may want to look into reporting quantities at the operation level as well as examining how scrap is controlled and reported.