Crossroads RMC Takes Polar to LX 8.3.4

Polar Beverages, the largest independent soft drink bottler in the United States, went live on Infor LX 8.3.4 on January 16, 2017. Polar partnered with Crossroads RMC for this important technology initiative. Included in the implementation were the Finance Supply Chain and Manufacturing modules. Phase 2 will include Adirondack Beverages, a subsidiary of Polar. This project will begin in Q3 2017.

Previous Article BPCS/LX Tip of the Week: Handwritten Inventory Tickets
Next Article Crossroads RMC, in partnership with Infor, takes Yupo to LX 8.3.4
Print
30737 Rate this article:
No rating
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule.

You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file.

In LX, the actual costs that can be set up fall into three categories: Material, Labor, and Overhead. If your LX database is set up properly with the LX cost accounting, you should be able to identify:

  • How much the item should cost
  • How to track the cost of work underway
  • How much the item actually did cost
  • Why the job cost varied from the expected cost
     

Capturing the data to track activity with associated costs can be time-consuming. With an MES solution, the information you need for costing is tracked instantly.