Crossroads RMC, in partnership with Infor, takes Yupo to LX 8.3.4

Yupo Corporation, a leader in synthetic paper, with products that are 100% recyclable, waterproof and tree-free, went live on Infor LX 8.3.4 on April 3, 2017. Yupo partnered with Crossroads RMC for this important technology upgrade. Included in the implementation were the Finance, Supply Chain, Manufacturing and Plant Maintenance (EAM) modules.

Previous Article Crossroads RMC Takes Polar to LX 8.3.4
Next Article Baan/LN Tip of the Week: Creating Product Variants
Print
28226 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

You can change your master schedule by specifying the type of master schedule update to perform. You can run a Net Change or Regenerative Schedule.

You also have the ability to clear the lower level requirements out of the Planned and Firm-Planned Order file.

In LX, the actual costs that can be set up fall into three categories: Material, Labor, and Overhead. If your LX database is set up properly with the LX cost accounting, you should be able to identify:

  • How much the item should cost
  • How to track the cost of work underway
  • How much the item actually did cost
  • Why the job cost varied from the expected cost
     

Capturing the data to track activity with associated costs can be time-consuming. With an MES solution, the information you need for costing is tracked instantly.